My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/19/2014BCC
CBCC
>
Meetings
>
2010's
>
2014
>
08/19/2014BCC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 12:24:24 PM
Creation date
3/3/2016 10:42:26 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/19/2014
Meeting Body
Board of County Commissioners
Supplemental fields
SmeadsoftID
13748
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Excerpts from Page 22 of the Preliminary Engineering Study of Flood <br />and Water Control Problems in the Upper St. Johns River Basin, Florida. <br />August, 1956 <br />The )mmse d dive Am caunl OR the southerly Bio' of the ali1nnaent of the Sona <br />Abe State Turnpitae; Extension which Of he u"d to convey water front Tno ("Pros, <br />Poo - <br />Crick aaac laadgctt ISranch,draivap;e arcus , should have capaeity to deliver at least 1,0 <br />Aches p,er day fNAH its drr hMe aarea, p>referahly MOM' suce the Tu'"Ne Isaac its P. - <br />Q0 lWeow we not "I ceQarj its, captivity is not i:oe:wn. H less than requ4ed to €e- <br />,aau.e l�fi inches per day, it will require enlarl.;ement, In any eventultimate ecoaOMY Of <br />=al construction tai° linking ups parallel I uruinke burrow 0" Q propsed, Such borrow <br />areas &H ucat be continuous and sail] not alter the exist'ane patterns of runoff until con- <br />Ymted ime a dhemion chaanucl sit suitable contn's <br />Excerpts from Page 23 of the Preliminary Engineering Study of Flood <br />and Water Control Problems in the Upper St. Johns River Basin, Florida. <br />August, 1956 <br />V'rstc, level C:ortrols <br />11 Sev11 eral large r.ulvrrts sill he rugatred through the I ura�i3 e to prevent the aac:�ur- <br />rence of excessive stages in the kd un Hiver-st.. Lucie llese"oir: These eulVertu must <br />be pratviciod mitts conral gums hesEa:m rauahenefieiul a,t Inc Cara he ,ac:ooml,lishud is the <br />10dit south of the Turnp,AQ the Turnpike Authorpty for its own intedw repuirentents, <br />prnhuWy will pnsteall mwe coma vop>t,W than required or ev"tual %nor contrtal. <br />8A9/2014 <br />29-g <br />
The URL can be used to link to this page
Your browser does not support the video tag.