F_ <br />MAY 0 5 1992, <br />In March the architect presented a estimated budget for the project <br />along with their anticipated fee. This cost was $279,250; some <br />$130,000 over staff's original estimate. The price included a <br />minimum of $23,250 for A&E fees which was almost $14,000 over the <br />original estimated fee. <br />The primary cause for this enormous increase was the " Change of Use" <br />as per City of Vero Beach Code. Staff knew this law prior to budget <br />preparation, but did not realize the cost associated with the change <br />until information was received from the architect. <br />Staff went back to the "drawing board" in an effort to reduce the <br />cost without effecting the scope of work. This was accomplished by <br />using in-house personnel to perform all labor they can, using <br />existing county contracts to purchase material along with installing <br />cost, and eliminating all cost that were not absolutely needed for <br />the project. A local architect was contacted and he agreed to <br />perform the necessary services for a fixed fee. of $10,000. This <br />reduced A&E fees by $13,250. Using this scenario, the architect's <br />original budget estimate was reduced by $147,075. <br />Our original time estimate was to have this project complete by June <br />of this year. The delay in time has caused the completion date to be <br />moved until October, 1992. With this delay, cost to continue lease <br />in the 2001 Building along with operational expense, is estimated at <br />$8,536. <br />ANALYSIS <br />A breakdown of total estimated cost is as follows: <br />Renovation Cost - $150,284 <br />Additional Rent & Expense 8,536 <br />Less Original Budget Funds (123,300) <br />TOTAL Short -Fall $ 35,520 <br />Even with the increase in cost, staff feels it is in the County's <br />best interest to renovate the Old Library Building as originally <br />recommended. This is based on the economical state that presently <br />exists with regard to sale of old buildings and the anticipated long <br />range planning for new buildings. These renovations should increase <br />the value of this facility, especially with the exterior painting of <br />the building along with work on the parking lot. <br />RECOMMENDATIONS: <br />Staff requests a budget amendment of an additional $35,528 to <br />complete the old library renovations as originally planned. <br />Commissioner Scurlock recalled that when we ran a cost <br />analysis on the options of whether to renovate the library or <br />continue to lease space in the 2001 Building, it was a number of <br />years before we reached a positive situation for the renovation. <br />He asked how this addition and change has impacted that original - <br />recommendation. <br />140 <br />