My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/5/1992
CBCC
>
Meetings
>
1990's
>
1992
>
5/5/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:31 PM
Creation date
6/16/2015 10:56:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/05/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
151
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F, <br />MV ROOK � �J F'; GE <br />-preliminary assessment roll on the above -referenced project. The <br />Utilities Department has completed the construction of the project. <br />We are now ready to begin customer connections and request the Board <br />of County Commissioners' approval of the final assessment roll. <br />(See attached minutes and Resolution III.) <br />,ANALYSIS <br />The preliminary assessment was for a total estimated project cost of <br />$27,430.00, which equates to ± $0.1153 per square foot of property <br />owned. The final assessment (see attached Resolution IV and the <br />accompanying assessment roll) is in the amount of $26,471.00, which <br />equates to a cost of $0.1116712509 per square foot of property. <br />All of the lots in this project are substandard or "undersized," <br />according to Indian River County's Comprehensive Plan, and the <br />County Public Health Unit, Division of Environmental Health, which <br />require that new lots utilizing well and septic systems be a minimum <br />of 1/2 acre. If served by a public water system, the lot may be <br />reduced to 1/4 acre in size. Lots not meeting these minimum <br />standards are called "undersized lots." <br />REMEMDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the adoption of Resolution IV. <br />ON MOTION by Commissioner Scurlock, SECONDED by <br />Commissioner Wheeler, the Board unanimously adopted <br />Resolution 92-69, certifying "as built" costs for <br />installation of a waterline extension in Anita Park <br />(38th Place), and other such construction necessitated <br />by such project; providing for formal completion date, <br />+ and date for payment without penalty and interest. <br />144 <br />
The URL can be used to link to this page
Your browser does not support the video tag.