My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015-004
CBCC
>
Official Documents
>
2010's
>
2015
>
2015-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2017 1:32:46 PM
Creation date
3/3/2016 10:35:33 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Miscellaneous
Approved Date
01/06/2015
Control Number
2015-004
Agenda Item Number
8.J.
Entity Name
Advanced Utility Systems
Subject
Statement of Work
Implementation of Infinity.Mobile
Supplemental fields
SmeadsoftID
14176
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A 3VAU <br />UTILITY SYSTEMS <br />• Costs are estimates only and do not include any expenses incurred by Advanced <br />to complete the SOW (i.e. travel, accommodations etc. if required to complete the <br />SOW) <br />• If expenses are incurred by Advanced to provide services outlined in this <br />statement of work, Advanced staff will be using a meal per diem of $65 per <br />weekday, and $120 per weekend day or holiday which will be billed to the utility, <br />and will not be required to submit receipts. All other expenses will continue to be <br />billed on actuals (i.e., airfare, hotel, car rental, fuel, mileage, travel time etc.) <br />Escalation Process <br />Several processes may trigger the escalation process, including issue tracking, contract <br />management, and risk management. This process assumes that prior attempts have been <br />made to resolve the item and the appropriate parties cannot reach a resolution. <br />When an item is escalated, the appropriate participants are notified via formal <br />communication (email, fax, or registered mail), which includes a summary of the <br />concern/issue and the analysis of each party's position. The participants must be <br />provided with sufficient time, to review the analysis and concerns prior to scheduling any <br />resolution meetings. <br />The levels of escalation and the participants in each level include: <br />1. Engagement Resource (Technical Specialist, Implementation Specialist, <br />Application Consultant) <br />2. Engagement Manager (Project Manager) <br />3. Engagement Sponsor (Manager of Client Services) <br />Standard of care/warranty disclaimer <br />The standard of care applicable to the Professional Consulting / Information Technology <br />(PC/IT) services arising under this SOW will be the degree of skill and diligence <br />normally employed by PC/IT consultants performing the same or similar services. No <br />further warranty of guaranty, expressed or implied, is made with respect to the services <br />furnished hereunder and all implied warranties are hereby disclaimed including the <br />warranty of merchantability and fitness for a particular purpose. <br />[5 ] <br />Indian River County <br />Reference ID: AT5510 <br />
The URL can be used to link to this page
Your browser does not support the video tag.