My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-086A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 3:00:06 PM
Creation date
3/3/2016 10:30:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/07/2013
Control Number
2013-086A
Agenda Item Number
8.P.
Entity Name
Ag-Scape Services contract documents and specifications
Subject
Oslo Road Culvert Replacement
Project Number
1306
Bid Number
2013034
Supplemental fields
SmeadsoftID
11935
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond satisfactory to OWNER to secure the Gemp:et,eR. There shall be ^++a;^h,9d_ tp- the oeirtif,,,�,te <br /> satisfaction and discharge of such Liens; <br /> befo,re-ffirnal payment. /N shall have GodoTn days <br /> c. there are other items entitling OWN- after reeeip+ of the tentative nertifina+e during whish fn <br /> ER to a set-off against the amount make written nhiee+inn to ENGINEER as to any <br /> recommended; or CA list. <br /> 6Af�Sidering }GnhrvbjeGtiells, EFIroI^:;=ER ^^-wn^madams <br /> d. OWNER has actual knowledge of the that the Work net substantially—ssFRID;ete, <br /> occurrence of any of the events enumerated E=NGINEER will within 14 days after submission c+he <br /> in paragraphs 14.02.B.5.a through <br /> 14.02.B.5.c or paragraph 15.02.A. in ���—.,,itmg,stating the—reasens therefer. if, after <br /> 69nSid +inn of fl\A/NER's ebjegtiiens, EFIrt�;":€ER <br /> 2. If OWNER refuses to make payment sensiders the—W Werk substantially GOmplete; <br /> of the full amount recommended by €foINEER wit'—,, li+h,�rsa4_1 14 days—execute and <br /> ENGINEER, OWNER must give <br /> CONTRACTOR immediate written notice (with Gert0firate of Substantial GGrnplet'GR (with a re <br /> a copy to ENGINEER) stating the reasons for <br /> such action and promptly pay CONTRACTOR reflen+inn si inh ehanees from the tentative nertifinate <br /> any amount remaining after deduction of the as ENGINEER believes justified after nnnsidera+inn of <br /> amount so withheld. OWNER shall promptly <br /> pay CONTRACTOR the amount so withheld, or f the tentative GertifiGateSubstantial- G-Gmple <br /> any adjustment thereto agreed to by OWNER ENGInIGGR will rter„er to OWNER and CONTRAG <br /> and CONTRACTOR, when CONTRACTOR <br /> corrects to OWNER's satisfaction the reasons responsibilities pending fiRal payment between <br /> for such action. OWNER and GONTRACTO R v.dth respeGt to SeGUr*, <br /> operation, safety, and proteGtiGR ef the VVeFk,, <br /> 3. If it is subsequently determined that nenanse, head utilities; insuran e, and warra^+ie <br /> OWNER's refusal of payment was not justified, and—guarantees. 11nIe,s n\IGR and <br /> the amount wrongfully withheld shall be treated CONTRACTOR agree ethepNise On wFiting and se <br /> as an amount due as determined by paragraph inform CnI(;InICCR in writing prier to ENGINE s <br /> 14.02.C.1. <br /> i <br /> 14.03 CONTRACTOR's Warranty of Title binding en OWNER and CONTRACTOR unto! final <br /> A. CONTRACTOR warrants and guarantees <br /> that title to all Work, materials, and equipment covered B. OWNER shall have the right to exclude <br /> by any Application for Payment, whether incorporated CONTRACTOR from the Site after the date of <br /> in the Project or not,will pass to OWNER no later than Substantial Completion, but OWNER shall allow CON- <br /> the time of payment free and clear of all Liens. TRACTOR reasonable access to complete or correct <br /> items on the tentative list. <br /> 14.04 Substantial Completion <br /> 14.05 Partial Utilization <br /> A. When CONTRACTOR considers the entire <br /> Work ready for its intended use CONTRACTOR shall A. Use by OWNER at OWNER's option of any <br /> notify OWNER and ENGINEER in writing that the substantially completed part of the Work which has <br /> entire Work is substantially complete (except for items specifically been identified in the Contract Documents, <br /> specifically listed by CONTRACTOR as incomplete) or which OWNER, ENGINEER, and CONTRACTOR <br /> and request that ENGINEER issue a certificate of agree constitutes a separately functioning and usable <br /> Substantial Completion. Promptly thereafter, part of the Work that can be used by OWNER for its <br /> OWNER, CONTRACTOR, and ENGINEER shall intended purpose without significant interference with <br /> make an inspection of the Work to determine the CONTRACTOR's performance of the remainder of <br /> status of completion. If ENGINEER does not consider the Work, may be accomplished prior to Substantial <br /> the Work substantially complete, ENGINEER will Completion of all the Work subject to the following <br /> notify CONTRACTOR in writing giving the reasons conditions. <br /> therefore. of €fI('`rGINEER—GGnsiders the WGrk <br /> substan+ialhrma�-GGIMrplete €r\I(wi-hrl=RER-. will 1. OWNER at any time may request <br /> deliver to OWNER a ten+ative eertifinate of Subsstantial CONTRACTOR in writing to permit OWNER to <br /> cniuc4.�-oci�rrioacc-. orvao ca��aa� <br /> Gemple+ieR yVh4nGhrshall fix +he date of Substantial use any such part of the Work which OWNER <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-40 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\Admim\bid documents\00700-General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.