My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-086A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 3:00:06 PM
Creation date
3/3/2016 10:30:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/07/2013
Control Number
2013-086A
Agenda Item Number
8.P.
Entity Name
Ag-Scape Services contract documents and specifications
Subject
Oslo Road Culvert Replacement
Project Number
1306
Bid Number
2013034
Supplemental fields
SmeadsoftID
11935
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTOR, indicating in writing the ARTICLE 15 -SUSPENSION OF WORK AND <br /> reasons for refusing to recommend final TERMINATION <br /> payment, in which case CONTRACTOR shall <br /> make the necessary corrections and resubmit <br /> the Application for Payment. 15.01 OWNER May Suspend Work <br /> C. Payment Becomes Due A. At any time and without cause, OWNER may <br /> suspend the Work or any portion thereof for a period <br /> ,1 Thirty days after the nresentatinn +c of not more than 90 consecutive days by notice in <br /> OWNERof the T nnliGatinn for Payment and writing to CONTRACTOR and ENGINEER which will <br /> fix the date on which Work will be resumed. CON- <br /> rGnnmmonded by ENGINEER will beGGme .due TRACTOR shall resume the Work on the date so <br /> and, when due, will be paid by OWNER t fixed. C-C-)NITRAC-TOR shall be allowed an adjustmen <br /> CONTRACTOR. ..n. the G_GntFaGt PFiGe or an extension of the Gentrai;t <br /> 14.08 Final Completion Delayed <br /> as prGvided paragraph 10.05. <br /> A. If, through no fault of CONTRACTOR, final <br /> completion of the Work is significantly delayed, and if 15.02 OWNER May Terminate for Cause <br /> ENGINEER so confirms, OWNER shall, upon receipt <br /> of CONTRACTOR's final Application for Payment and A. The occurrence of any one or more of the <br /> recommendation of ENGINEER, and without terminat- following events will justify termination for cause: <br /> ing the Agreement, make payment of the balance due <br /> for that portion of the Work fully completed and 1. CONTRACTOR's persistent failure <br /> accepted. If the remaining balance to be held by to perform the Work in accordance with the <br /> OWNER for Work not fully completed or corrected is Contract Documents (including, but not limited <br /> less than the retainage stipulated in the Agreement, to, failure to supply sufficient skilled workers or <br /> and if Bonds have been furnished as required in suitable materials or equipment or failure to <br /> paragraph 5.01, the written consent of the surety to adhere to the progress schedule established <br /> the payment of the balance due for that portion of the under paragraph 2.07 as adjusted from time to <br /> Work fully completed and accepted shall be submitted time pursuant to paragraph 6.04); <br /> by CONTRACTOR to ENGINEER with the Application <br /> for such payment. Such payment shall be made 2. CONTRACTOR's disregard of Laws <br /> under the terms and conditions governing final or Regulations of any public body having <br /> payment, except that it shall not constitute a waiver of jurisdiction; <br /> Claims. <br /> 3. CONTRACTOR's disregard of the <br /> 14.09 Waiver of Claims authority of ENGINEER; or <br /> A. The making and acceptance of final payment 4. CONTRACTOR's violation in any <br /> will constitute: substantial way of any provisions of the <br /> Contract Documents. <br /> 1. a waiver of all Claims by OWNER <br /> against CONTRACTOR, except Claims arising B. If one or more of the events identified in <br /> from unsettled Liens, from defective Work paragraph 15.02.A occur, OWNER may, after giving <br /> appearing after final inspection pursuant to CONTRACTOR (and the surety, if any) seven days <br /> paragraph 14.06, from failure to comply with the written notice, terminate the services of <br /> Contract Documents or the terms of any special CONTRACTOR, exclude CONTRACTOR from the <br /> guarantees specified therein, or from Site, and take possession of the Work and of all <br /> CONTRACTOR's continuing obligations under CONTRACTOR's tools, appliances, construction <br /> the Contract Documents; and equipment, and machinery at the Site, and use the <br /> same to the full extent they could be used by <br /> 2. a waiver of all Claims by CONTRAC- CONTRACTOR (without liability to CONTRACTOR for <br /> TOR against OWNER other than those trespass or conversion), incorporate in the Work all <br /> previously made in writing which are still materials and equipment stored at the Site or for <br /> unsettled. which OWNER has paid CONTRACTOR but which <br /> are stored elsewhere, and finish the Work as OWNER <br /> may deem expedient. In such case, CONTRACTOR <br /> 00700-General Conditions REV 04-07.doe <br /> 00700-42 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\Admim\bid documents\00700-General Conditions REV 04-07.doc <br />