Laserfiche WebLink
SECTION 00948 -Work Change Directive <br /> No. <br /> EFFECTIVE DATE: <br /> DATE OF ISSUANCE: <br /> OWNER: Indian River County <br /> CONTRACTOR: <br /> Bid No.: 2013034 <br /> Project: Oslo Road Culvert Replacement <br /> OWNER's Project No. 1306 <br /> ENGINEER: Indian River County <br /> You are directed to proceed promptly with the following changes: <br /> Description: <br /> Purpose of Work Change Directive: <br /> Attachments: (List documents supporting change) <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents. <br /> Method of determining change in Method of determining change in <br /> Contract Prices: Contract Times <br /> II Unit Prices ❑Contractor's Records <br /> 171 Lump Sum II Engineer's Records <br /> J�Other: Q Other: <br /> II By Change Order: II By Change Order: <br /> Estimated increase (decrease) in Contract Price: Estimated increase (decrease) in Contract Times: <br /> $ Substantial Completion: days; <br /> Ready for Final Completion: days. <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization. authorization. <br /> ACCEPTED: RECOMMENDED: APPROVED: <br /> By: By: By: <br /> CONTRACTOR (Signature) ENGINEER (Signature) OWNER (Signature) <br /> Date: Date: ADate: <br /> * * END OF SECTION * * <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\Admim\bid <br /> documents\00948-Work Change Directive REV 04-07.doc <br />