My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-086A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 3:00:06 PM
Creation date
3/3/2016 10:30:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/07/2013
Control Number
2013-086A
Agenda Item Number
8.P.
Entity Name
Ag-Scape Services contract documents and specifications
Subject
Oslo Road Culvert Replacement
Project Number
1306
Bid Number
2013034
Supplemental fields
SmeadsoftID
11935
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01215 <br /> GENERAL QUALITY CONTROL <br /> 1.1 DESCRIPTION OF REQUIREMENTS <br /> A. Definitions: Specific quality control requirements for the work are indicated <br /> throughout the Contract Documents. The requirements of this section are <br /> primarily related to the performance of the work beyond the furnishing of <br /> manufactured products. The term "Quality Control' includes, but is not <br /> necessarily limited to, inspection and testing and associated requirements. <br /> This section does not specify or modify the OWNER and ENGINEER duties <br /> relating to quality review and Contract surveillance. <br /> 1.2 RESPONSIBILITY FOR INSPECTIONS AND TESTS <br /> A. Residual OWNER Responsibility: The OWNER will employ and pay for the <br /> services of independent testing laboratories to perform those required <br /> inspections and tests. <br /> B. CONTRACTORS General Responsibility: No failure of test agencies, whether <br /> engaged by the OWNER or CONTRACTOR, to perform adequate inspections <br /> of tests or to properly analyze or report results, shall relieve the <br /> CONTRACTOR of responsibility for the fulfillment of the requirements of the <br /> Contract Documents. It is recognized that the required inspection and testing <br /> program is intended to assist the CONTRACTOR, OWNER, ENGINEER, and <br /> governing authorities in the nominal determination of probable compliance with <br /> requirements for certain crucial elements of work. The program is not intended <br /> to limit the CONTRACTOR in his regular quality control program, as needed <br /> for general assurance of compliance. <br /> 1.3 QUALITY ASSURANCE <br /> A. General Workmanship Standards: It is a requirement that each category of <br /> tradesman or installer performing the work be pre-qualified, to the extent of being <br /> familiar with the applicable and recognized quality standards for his category of <br /> work, and being capable of workmanship complying with those standards. <br /> 1.4 PRODUCT DELIVERY-STORAGE-HANDLING <br /> Handle, store and protect materials and products, including fabricated components, by <br /> methods and means which will prevent damage, deterioration and losses (and resulting <br /> delays), thereby ensuring highest quality results as the performance of the work <br /> progresses. Control delivery schedules so as to minimize unnecessary long-term <br /> 01215-1 01215 General Quality Control <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\Admim\bid <br /> documents\01215 General Quality.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.