My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-086A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 3:00:06 PM
Creation date
3/3/2016 10:30:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/07/2013
Control Number
2013-086A
Agenda Item Number
8.P.
Entity Name
Ag-Scape Services contract documents and specifications
Subject
Oslo Road Culvert Replacement
Project Number
1306
Bid Number
2013034
Supplemental fields
SmeadsoftID
11935
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> B. TEMPORARY SANITARY FACILITIES <br /> 1. Provide temporary toilet facilities separate from the job office. <br /> Maintain these during the entire period of construction under this <br /> Contract for the use of all construction personnel on the job. <br /> Provide enough chemical toilets to conveniently serve the needs of <br /> all personnel. Properly seclude toilet facilities from public <br /> observation. <br /> 2. Chemical toilets and their maintenance shall meet the requirements <br /> of State and local health regulations and ordinances. Immediately <br /> correct any facilities or maintenance methods failing to meet these <br /> requirements. Upon completion of work, remove the facilities from <br /> the premises. <br /> 1.4 SECURITY <br /> Full time watchmen will not be specifically required as a part of the Contract, but <br /> the CONTRACTOR shall provide inspection of work area daily and shall take <br /> whatever measures are necessary to protect the safety of the public, workmen, <br /> and materials, and provide for the security of the site, both day and night. <br /> 1.5 TEMPORARY CONTROLS <br /> Take all necessary precautions to control dust and mud associated with the work <br /> of this Contract. In dry weather, spray dusty areas daily with water in order to <br /> control dust. Take necessary steps to prevent the tracking of mud onto adjacent <br /> streets and highways. <br /> 1.6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br /> Remove the various temporary facilities, services, and controls and legally <br /> dispose of them as soon as the work is complete. The areas of the site used for <br /> temporary facilities shall be properly reconditioned and restored to a condition <br /> acceptable to the OWNER. <br /> + + END OF SECTION + + <br /> 01520-2 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\Admim\bid <br /> documents\01520-Construction Facilities.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.