Laserfiche WebLink
SECTION 01710 <br /> SITE CLEANUP AND RESTORATION <br /> 1.1 SCOPE <br /> Furnish all labor, equipment, appliances, and materials required or necessary to clean up <br /> and restore the site after the construction is completed. <br /> 1.2 REQUIREMENTS <br /> A. During the progress of the project, keep the work and the adjacent areas affected <br /> thereby in a neat and orderly condition. Remove all rubbish, surplus materials, <br /> and unused construction equipment. Repair all damage so that the public and <br /> property owners will be inconvenienced as little as possible. <br /> B. Provide onsite containers for the collection of waste materials, debris, and <br /> rubbish and empty such containers in a legal manner when they become full. <br /> C. Where material or debris has been deposited in watercourses, ditches, gutters, <br /> drains, or catch-basins as a result of the CONTRACTOR's operations, such <br /> material or debris shall be entirely removed and satisfactorily disposed of during <br /> the progress of the work, and the ditches, channels, drains, etc., shall be kept <br /> clean and open at all times. <br /> D. Before the completion of the project, unless otherwise especially directed or <br /> permitted in writing: <br /> 1. Tear down and remove all temporary buildings and structures; <br /> 2. Remove all temporary works, tools, and machinery, or other construction <br /> equipment furnished; <br /> 3. Remove all rubbish from any grounds occupied; and <br /> 4. Leave the roads, all parts of the premises, and adjacent property affected <br /> by construction operations, in a neat and satisfactory condition. <br /> E. Restore or replace any public or private property damaged by construction work, <br /> equipment, or employees, to a condition at least equal to that existing <br /> immediately prior to the beginning of the operations. To this end, the <br /> CONTRACTOR shall restore all highway, roadside, and landscaping work within <br /> any right-of-way, platted or prescriptive. Acceptable materials, equipment,and <br /> methods shall be used for such restoration. <br /> F. Thoroughly clean all materials and equipment installed and on completion of the <br /> work, deliver the facilities undamaged and in fresh and new-appearing condition. <br /> G. It is the intent of the Specifications to place the responsibility on the <br /> CONTRACTOR to restore to their original condition all items disturbed, <br /> destroyed, or damaged during construction. Particular attention will be placed on <br /> restoration of canals to equal or better condition than prior to construction. <br /> H. When finished surfaces require cleaning with cleaning materials, use only those <br /> cleaning materials which will not create hazards to health or property and which <br /> will not damage the surfaces. Use cleaning materials only on those surfaces <br /> recommended by the manufacturer. Follow the manufacturer's directions and <br /> recommendations at all times. <br /> 01710 Site Cleanup <br /> 01710-1 <br /> F:\PublicWorks\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\Admim\bid documents\01710- <br /> Site Cleanup.doc <br />