My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-086A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 3:00:06 PM
Creation date
3/3/2016 10:30:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/07/2013
Control Number
2013-086A
Agenda Item Number
8.P.
Entity Name
Ag-Scape Services contract documents and specifications
Subject
Oslo Road Culvert Replacement
Project Number
1306
Bid Number
2013034
Supplemental fields
SmeadsoftID
11935
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> Title Page <br /> ARTICLE 1 - DEFINITIONS AND TERMINOLOGY.....................................................................................................5 <br /> 1.01 Defined Terms...................................................................................................................................5 <br /> 1.02 Terminology.......................................................................................................................................7 <br /> ARTICLE2 -PRELIMINARY MATTERS......................................................................................................................8 <br /> 2.01 Delivery of Bonds..............................................................................................................................8 <br /> 2.02 Copies of Documents........................................................................................................................8 <br /> 2.03 Commencement of Contract Times;Notice to Proceed...................................................................8 <br /> 2.04 Starting the Work...............................................................................................................................8 <br /> 2.05 Before Starting Construction.............................................................................................................8 <br /> 2.06 Preconstruction Conference.............................................................................................................9 <br /> 2.07 Initial Acceptance of Schedules........................................................................................................9 <br /> ARTICLE 3-CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE................................................................9 <br /> 3.01 Intent..................................................................................................................................................9 <br /> 3.02 Reference Standards........................................................................................................................10 <br /> 3.03 Reporting and Resolving Discrepancies...........................................................................................10 <br /> 3.04 Amending and Supplementing Contract Documents.......................................................................10 <br /> 3.05 Reuse of Documents.........................................................................................................................10 <br /> ARTICLE 4 -AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; REFERENCE <br /> POINTS.....................................................................................................................................................11 <br /> 4.01 Availability of Lands...........................................................................................................................11 <br /> 4.02 Subsurface and Physical Conditions................................................................................................11 <br /> 4.03 Differing Subsurface or Physical Conditions.....................................................................................11 <br /> 4.04 Underground Facilities......................................................................................................................12 <br /> 4.05 Reference Points...............................................................................................................................13 <br /> 4.06 Hazardous Environmental Condition at Site.....................................................................................13 <br /> ARTICLE5- BONDS AND INSURANCE.....................................................................................................................14 <br /> 5.01 Performance, Payment, and Other Bonds........................................................................................14 <br /> 5.02 Licensed Sureties and Insurers........................................................................................................15 <br /> 5.03 Certificates of Insurance...................................................................................................................15 <br /> 5.04 CONTRACTOR's Liability Insurance................................................................................................15 <br /> 5.05 OWNER's Liability Insurance............................................................................................................16 <br /> 5.06 Property Insurance............................................................................................................................16 <br /> 5.07 Waiver of Rights................................................................................................................................17 <br /> 5.08 Receipt and Application of Insurance Proceeds...............................................................................18 <br /> 5.09 Acceptance of Bonds and Insurance; Option to Replace.................................................................18 <br /> 5.10 Partial Utilization, Acknowledgment of Property Insurer...................................................................18 <br /> ARTICLE 6-CONTRACTOR'S RESPONSIBILITIES.................................................................................................18 <br /> 6.01 Supervision and Superintendence....................................................................................................18 <br /> 6.02 Labor; Working Hours.......................................................................................................................18 <br /> 6.03 Services, Materials, and Equipment.................................................................................................19 <br /> 6.04 Progress Schedule............................................................................................................................19 <br /> 6.05 Substitutes and"Or-Equals"..............................................................................................................19 <br /> 6.07 Patent Fees and Royalties................................................................................................................21 <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-2 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\Admim\bid documents\00700-General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.