establish the standards by which such portion of the
<br /> Work will be judged. 47. Unit Price Work--Work to be paid for on
<br /> the basis of unit prices.
<br /> 39. Shop Drawings--All drawings, diagrams,
<br /> illustrations, schedules, and other data or information 48. Work--The entire completed construction
<br /> which are specifically prepared or assembled by or for or the various separately identifiable parts thereof re-
<br /> CONTRACTOR and submitted by CONTRACTOR to quired to be provided under the Contract Documents.
<br /> illustrate some portion of the Work. Work includes and is the result of performing or
<br /> providing all labor, services, and documentation
<br /> 40. Site--Lands or areas indicated in the necessary to produce such construction, and
<br /> Contract Documents as being furnished by OWNER furnishing, installing, and incorporating all materials
<br /> upon which the Work is to be performed, including and equipment into such construction, all as required
<br /> rights-of-way and easements for access thereto, and by the Contract Documents.
<br /> such other lands furnished by OWNER which are
<br /> designated for the use of CONTRACTOR. 49. Work Change Directive--A written
<br /> statement to CONTRACTOR issued on or after the
<br /> 41. Specifications--That part of the Contract Effective Date of the Agreement and signed by
<br /> Documents consisting of written technical descriptions OWNER and recommended by ENGINEER ordering
<br /> of materials, equipment, systems, standards, and an addition, deletion, or revision in the Work, or
<br /> workmanship as applied to the Work and certain responding to differing or unforeseen subsurface or
<br /> administrative details applicable thereto. physical conditions under which the Work is to be
<br /> performed or to emergencies. A Work Change
<br /> 42. Subcontractor--An individual or entity Directive will not change the Contract Price or the
<br /> having a direct contract with CONTRACTOR or with Contract Times but is evidence that the parties expect
<br /> any other Subcontractor for the performance of a part that the change ordered or documented by a Work
<br /> of the Work at the Site. Change Directive will be incorporated in a subse-
<br /> quently issued Change Order following negotiations by
<br /> 43. Substantial Completion--The time at the parties as to its effect, if any, on the Contract Price
<br /> which the Work (or a specified part thereof) has or Contract Times.
<br /> progressed to the point where, in the opinion of
<br /> ENGINEER, the Work (or a specified part thereof) is 50. Written Amendment--A written statement
<br /> sufficiently complete, in accordance with the Contract modifying the Contract Documents, signed by
<br /> Documents, so that the Work (or a specified part OWNER and CONTRACTOR on or after the Effective
<br /> thereof) can be utilized for the purposes for which it is Date of the Agreement and normally dealing with the
<br /> intended. The terms "substantially complete" and nonengineering or nontechnical rather than strictly
<br /> "substantially completed" as applied to all or part of the construction-related aspects of the Contract Docu-
<br /> Work refer to Substantial Completion thereof. ments.
<br /> 44. Supplementary Conditions--That part of 1.02 Terminology
<br /> the Contract Documents which amends or
<br /> supplements these General Conditions. A. Intent of Certain Terms or Adjectives
<br /> 45. Supplier--A manufacturer, fabricator, 1. Whenever in the Contract Documents the
<br /> supplier, distributor, materialman, or vendor having a terms "as allowed," "as approved," or terms of like
<br /> direct contract with CONTRACTOR or with any effect or import are used, or the adjectives
<br /> Subcontractor to furnish materials or equipment to be "reasonable," "suitable," "acceptable," "proper,"
<br /> incorporated in the Work by CONTRACTOR or any "satisfactory," or adjectives of like effect or import
<br /> Subcontractor. are used to describe an action or determination of
<br /> ENGINEER as to the Work, it is intended that such
<br /> 46. Underground Facilities--All underground action or determination will be solely to evaluate, in
<br /> pipelines, conduits, ducts, cables, wires, manholes, general, the completed Work for compliance with
<br /> vaults, tanks, tunnels, or other such facilities or the requirements of and information in the Contract
<br /> attachments, and any encasements containing such Documents and conformance with the design
<br /> facilities, including those that convey electricity, gases, concept of the completed Project as a functioning
<br /> steam, liquid petroleum products, telephone or other whole as shown or indicated in the Contract
<br /> communications, cable television, water, wastewater, Documents (unless there is a specific statement
<br /> storm water, other liquids or chemicals, or traffic or indicating otherwise). The use of any such term or
<br /> other control systems. adjective shall not be effective to assign to ENGI-