thereby; however, CONTRACTOR shall not be liable 2.07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict, error, ambiguity, or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents, at least ten days before submission of the <br /> reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR, ENGINEER, and others as appropri- <br /> B. Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI- <br /> the Effective Date of the Agreement(unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements), CONTRAC- accordance with paragraph 2.05.13. CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> 1. a preliminary progress schedule schedules. No progress payment shall be made to <br /> indicating the times (numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER. <br /> of the Work, including any Milestones specified <br /> in the Contract Documents; 1. The progress schedule will be <br /> acceptable to ENGINEER if it provides an <br /> 2. a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times. Such acceptance will not <br /> mitting, reviewing, and processing such impose on ENGINEER responsibility for the <br /> submittal; and progress schedule, for sequencing, scheduling, <br /> or progress of the Work nor interfere with or <br /> 3. a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR's <br /> all of the Work which includes quantities and full responsibility therefor. <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2. CONTRACTOR's schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work. Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals. <br /> and profit applicable to each item of Work. <br /> 3. CONTRACTOR's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> the Site is started, CONTRACTOR and OWNE all and substance if it provides a reasonable <br /> each deliver to the other, with copi o each allocation of the Contract Price to component <br /> additional insured identified in t upplementary parts of the Work. <br /> Conditions, certificates of ' urance (and other <br /> evidence of insurance ich either of them or any ARTICLE 3 -CONTRACT DOCUMENTS: INTENT, <br /> additional insur may reasonably request) which AMENDING, REUSE <br /> CONTRA and OWNER respectively are <br /> Ip <br /> 3.01 Intent <br /> 2.06 Preconstruction Conference A. The Contract Documents are comple- <br /> mentary; what is called for by one is as binding as if <br /> A. Within 20 days after the GGRtraGt Timel; stfrrt called for by all. <br /> to run, but before any Work at the Site iarted, a <br /> conference attended by CONTR�held <br /> ENGINEER, B. It is the intent of the Contract Documents to <br /> and others as appropriate wilo establish a describe a functionally complete Project(or part there- <br /> of) to be constructed in accordance with the Contract <br /> Work and to tsc a schedules referred to in para- Documents. Any labor, documentation, services, <br /> graph 2.05. ocedures for handling Shop Drawings materials, or equipment that may reasonably be <br /> and _other submittals, processing Applications for inferred from the Contract Documents or from <br /> prevailing custom or trade usage as being required to <br /> produce the intended result will be provided whether <br /> or not specifically called for at no additional cost to <br /> OWNER. <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-9 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert ImprovementWdmim\bid documents\00700-General Conditions REV 04-07.doc <br />