Official Document Type
Contract
Approved Date
05/07/2013
Control Number
2013-086A
Agenda Item Number
8.P.
Entity Name
Ag-Scape Services contract documents and specifications
Subject
Oslo Road Culvert Replacement
Project Number
1306
Bid Number
2013034
Supplemental fields
SmeadsoftID
11935
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
subsurface or physical conditions or performing any c. CONTRACTOR failed to give the <br /> Work in connection therewith (except in an emergency written notice within the time and as ye- <br /> as required by paragraph 6.16.A), notify OWNER and quired by paragraph 4.03.A. <br /> ENGINEER in writing about such condition. <br /> CONTRACTOR shall not , further disturb such 3. If OWNER and CONTRACTOR are <br /> condition or perform any Work in connection therewith unable to agree on entitlement to or on the <br /> (except as aforesaid) until receipt of written order to do amount or extent, if any, of any adjustment in <br /> so. the Contract Price or Contract Times, or both, a <br /> Claim may be made therefor as provided in <br /> B. ENGINEER's Review. After receipt of written paragraph 10.05. However, OWNER, <br /> notice as required by paragraph 4.03.A, ENGINEER ENGINEER, and ENGINEER's Consultants <br /> will promptly review the pertinent condition, determine shall not be liable to CONTRACTOR for any <br /> the necessity of OWNER's obtaining additional claims, costs, losses, or damages (including <br /> exploration or tests with respect thereto, and advise but not limited to all fees and charges of <br /> OWNER in writing (with a copy to CONTRACTOR) of engineers, architects, attorneys, and other <br /> ENGINEER's findings and conclusions. professionals and all court or arbitration or other <br /> dispute resolution costs) sustained by <br /> C. Possible Price and Times Adjustments CONTRACTOR on or in connection with any <br /> other project or anticipated project. <br /> 1. The Contract Price or the Contract <br /> Times, or both, will be equitably adjusted to the 4.04 Underground Facilities <br /> extent that the existence of such differing <br /> subsurface or physical condition causes an in- A. Shown or Indicated.The information and data <br /> crease or decrease in CONTRACTOR's cost shown or indicated in the Contract Documents with <br /> of, or time required for, performance of the respect to existing Underground Facilities at or <br /> Work; subject, however, to the following: contiguous to the Site is based on information and <br /> data furnished to OWNER or ENGINEER by the <br /> a. such condition must meet any one or owners of such Underground Facilities, including <br /> more of the categories described in para- OWNER, or by others. Unless it is otherwise <br /> graph 4.03.A; and expressly provided in the Supplementary Conditions: <br /> b. with respect to Work that is paid for 1. OWNER and ENGINEER shall not <br /> on a Unit Price Basis, any adjustment in be responsible for the accuracy or com- <br /> Contract Price will be subject to the pleteness of any such information or data; and <br /> provisions of paragraphs 9.08 and 11.03. <br /> 2. the cost of all of the following will be <br /> 2. CONTRACTOR shall not be entitled included in the Contract Price, and CONTRAC- <br /> to any adjustment in the Contract Price or TOR shall have full responsibility for: <br /> Contract Times if: <br /> a. reviewing and checking all such <br /> a. CONTRACTOR knew of the information and data, <br /> existence of such conditions at the time <br /> CONTRACTOR made a final commitment b. locating all Underground Facilities <br /> to OWNER in respect of Contract Price and shown or indicated in the Contract <br /> Contract Times by the submission of a Bid Documents, <br /> or becoming bound under a negotiated <br /> contract; or c. coordination of the Work with the <br /> owners of such Underground Facilities, <br /> b. the existence of such condition could including OWNER, during construction, and <br /> reasonably have been discovered or <br /> revealed as a result of any examination, d. the safety and protection of all such <br /> investigation, exploration, test, or study of Underground Facilities and repairing any <br /> the Site and contiguous areas required by damage thereto resulting from the Work. <br /> the Bidding Requirements or Contract <br /> Documents to be conducted by or for CON- B. Not Shown or Indicated <br /> TRACTOR prior to CONTRACTOR's <br /> making such final commitment; or 1. If an Underground Facility is <br /> uncovered or revealed at or contiguous to the <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-12 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\Admim\bid documents\00700-General Conditions REV 04-07.doc <br />