My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-086A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-086A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 3:00:06 PM
Creation date
3/3/2016 10:30:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/07/2013
Control Number
2013-086A
Agenda Item Number
8.P.
Entity Name
Ag-Scape Services contract documents and specifications
Subject
Oslo Road Culvert Replacement
Project Number
1306
Bid Number
2013034
Supplemental fields
SmeadsoftID
11935
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Substitute Items directly or indirectly from use of such <br /> substitute item, including costs of redesign <br /> a. If in ENGINEER's sole discretion an and claims of other contractors affected by <br /> item of material or equipment proposed by any resulting change, all of which will be <br /> CONTRACTOR does not qualify as an considered by ENGINEER in evaluating the <br /> "or-equal" item under paragraph 6.05.A.1, it proposed substitute item. ENGINEER may <br /> will be considered a proposed substitute require CONTRACTOR to furnish additional <br /> item. data about the proposed substitute item. <br /> b. CONTRACTOR shall submit suffi- B. Substitute Construction Methods or Proce- <br /> cient information as provided below to allow dures: If a specific means, method, technique, se- <br /> ENGINEER to determine that the item of quence, or procedure of construction is shown or <br /> material or equipment proposed is indicated in and expressly required by the Contract <br /> essentially equivalent to that named and an Documents, CONTRACTOR may furnish or utilize a <br /> acceptable substitute therefor. Requests for substitute means, method, technique, sequence, or <br /> review of proposed substitute items of procedure of construction approved by ENGINEER. <br /> material or equipment will not be accepted CONTRACTOR shall submit sufficient information to <br /> by ENGINEER from anyone other than allow ENGINEER, in ENGINEER's sole discretion, to <br /> CONTRACTOR. determine that the substitute proposed is equivalent to <br /> that expressly called for by the Contract Documents. <br /> c. The procedure for review by ENGI- The procedure for review by ENGINEER will be similar <br /> NEER will be as set forth in paragraph to that provided in subparagraph 6.05.A.2. <br /> 6.05.A.2.d, as supplemented in the General <br /> Requirements and as ENGINEER may C. Engineer's Evaluation: ENGINEER will be <br /> decide is appropriate under the allowed a reasonable time within which to evaluate <br /> circumstances. each proposal or submittal made pursuant to para- <br /> graphs 6.05.A and 6.05.B. ENGINEER will be the <br /> d. CONTRACTOR shall first make sole judge of acceptability. No"or-equal" or substitute <br /> written application to ENGINEER for review will be ordered, installed or utilized until ENGINEER's <br /> of a proposed substitute item of material or review is complete,which will be evidenced by either a <br /> equipment that CONTRACTOR seeks to Change Order for a substitute or an approved Shop <br /> furnish or use. The application shall certify Drawing for an "or equal." ENGINEER will advise <br /> that the proposed substitute item will CONTRACTOR in writing of any negative <br /> perform adequately the functions and determination. <br /> achieve the results called for by the general <br /> design, be similar in substance to that D. Special Guarantee: OWNER may require <br /> specified, and be suited to the same use as CONTRACTOR to furnish at CONTRACTOR's ex- <br /> that specified. The application will state the pense a special performance guarantee or other <br /> extent, if any, to which the use of the pro- surety with respect to any substitute. <br /> posed substitute item will prejudice <br /> CONTRACTOR's achievement of Substan- E. ENGINEER's Cost Reimbursement: <br /> tial Completion on time, whether or not use ENGINEER will record time required by ENGINEER <br /> of the proposed substitute item in the Work and ENGINEER's Consultants in evaluating substitute <br /> will require a change in any of the Contract proposed or submitted by CONTRACTOR pursuant to <br /> Documents(or in the provisions of any other paragraphs 6.05.A.2 and 6.05.6 and in making <br /> direct contract with OWNER for work on the changes in the Contract Documents (or in the <br /> Project) to adapt the design to the proposed provisions of any other direct contract with OWNER <br /> substitute item and whether or not for work on the Project) occasioned thereby. Whether <br /> incorporation or use of the proposed substi- or not ENGINEER approves a substitute item so pro- <br /> tute item in connection with the Work is sub- posed or submitted by CONTRACTOR, CON- <br /> ject to payment of any license fee or royalty. TRACTOR shall reimburse OWNER for the charges <br /> All variations of the proposed substitute of ENGINEER and ENGINEER's Consultants for <br /> item from that specified will be identified in evaluating each such proposed substitute. <br /> the application, and available engineering, <br /> sales, maintenance, repair, and F. CONTRACTOR's Expense: CONTRACTOR <br /> replacement services will be indicated. The shall provide all data in support of any proposed <br /> application will also contain an itemized esti- substitute or"or-equal"at CONTRACTOR's expense. <br /> mate of all costs or credits that will result <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-20 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\Admim\bid documents\00700-General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.