Laserfiche WebLink
8.10 Undisclosed Hazardous Environmental of ENGINEER's visits or observations of <br /> Condition CONTRACTOR's Work ENGINEER will not <br /> supervise, direct, control, or have authority over or be <br /> A. OWNER's responsibility in respect to an responsible for CONTRACTOR's means, methods, <br /> undisclosed Hazardous Environmental Condition is techniques, sequences, or procedures of construction, <br /> set forth in paragraph 4.06. or the safety precautions and programs incident <br /> thereto, or for any failure of CONTRACTOR to comply <br /> 8.11 Evidence of Financial Arrangements with Laws and Regulations applicable to the <br /> performance of the Work. <br /> A. If and to the extent OWNER has agreed to <br /> furnish CONTRACTOR reasonable evidence that 9.03 Project Representative <br /> financial arrangements have been made to satisfy <br /> OWNER's obligations under the Contract Documents, A. If OWNER and ENGINEER agree, ENGI- <br /> OWNER's responsibility in respect thereof will be as NEER will furnish a Resident Project Representative <br /> set forth in the Supplementary Conditions, to assist ENGINEER in providing more extensive <br /> observation of the Work. The responsibilities and <br /> authority and limitations thereon of any such Resident <br /> ARTICLE 9- ENGINEER'S STATUS DURING Project Representative and assistants will be as <br /> CONSTRUCTION provided in paragraph 9.10 and in the Supplementary <br /> Conditions. If OWNER designates another represen- <br /> tative or agent to represent OWNER at the Site who is <br /> 9.01 OWNER'S Representative not ENGINEER's Consultant, agent or employee, the <br /> responsibilities and authority and limitations thereon of <br /> A. ENGINEER will be OWNER's representative such other individual or entity will be as provided in the <br /> during the construction period. The duties and Supplementary Conditions. <br /> responsibilities and the limitations of authority of <br /> ENGINEER as OWNER's representative during 9.04 Clarifications and Interpretations <br /> construction are set forth in the Contract Documents <br /> and will not be changed without written consent of A. ENGINEER will issue with reasonable <br /> OWNER and ENGINEER. promptness such written clarifications or interpreta- <br /> tions of the requirements of the Contract Documents <br /> 9.02 Visits to Site as ENGINEER may determine necessary, which shall <br /> be consistent with the intent of and reasonably <br /> A. ENGINEER will make visits to the Site at inferable from the Contract Documents. Such written <br /> intervals appropriate to the various stages of construc- clarifications and interpretations will be binding on <br /> tion as ENGINEER deems necessary in order to OWNER and CONTRACTOR. If OWNER and CON- <br /> observe as an experienced and qualified design TRACTOR are unable to agree on entitlement to or on <br /> professional the progress that has been made and the the amount or extent, if any, of any adjustment in the <br /> quality of the various aspects of CONTRACTOR's Contract Price or Contract Times, or both, that should <br /> executed Work. Based on information obtained be allowed as a result of a written clarification or <br /> during such visits and observations, ENGINEER, for interpretation, a Claim may be made therefor as <br /> the benefit of OWNER, will determine, in general, if provided in paragraph 10.05. <br /> the Work is proceeding in accordance with the Con- <br /> tract Documents. ENGINEER will not be required to 9.05 Authorized Variations in Work <br /> make exhaustive or continuous inspections on the <br /> Site to check the quality or quantity of the Work. A. ENGINEER may authorize minor variations in <br /> ENGINEER's efforts will be directed toward providing the Work from the requirements of the Contract <br /> for OWNER a greater degree of confidence that the Documents which do not involve an adjustment in the <br /> completed Work will conform generally to the Contract Contract Price or the Contract Times and are compati- <br /> Documents. On the basis of such visits and ble with the design concept of the completed Project <br /> observations, ENGINEER will keep OWNER informed as a functioning whole as indicated by the Contract <br /> of the progress of the Work and will endeavor to guard Documents. These may be accomplished by a Field <br /> OWNER against defective Work. Order and will be binding on OWNER and also on <br /> CONTRACTOR, who shall perform the Work involved <br /> B. ENGINEER's visits and observations are promptly. If OWNER and CONTRACTOR are unable <br /> subject to all the limitations on ENGINEER's authority to agree on entitlement to or on the amount or extent, <br /> and responsibility set forth in paragraph 9.10, and if any, of any adjustment in the Contract Price or <br /> particularly, but without limitation, during or as a result Contract Times, or both, as a result of a Field Order, <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-28 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1306 Oslo Road(E of 15th Ave SW)Pipe Culvert Improvement\AdmWbid documents\00700-General Conditions REV 04-07.doc <br />