My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-124A (2)
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-124A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 2:57:08 PM
Creation date
3/3/2016 10:28:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/03/2012
Control Number
2012-124A
Agenda Item Number
8.Q.
Entity Name
Ag-Scape Services
Subject
Sandridge Golf Course Driving Range Tee Renovations Contract
Project Number
1210
Bid Number
2012040
Supplemental fields
SmeadsoftID
11321
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a Ton clays after presentation of the <br /> on for Payment to OWNER with 14.04 Substantial Completion <br /> €Y rJ EER's�eGo,�;n en a+inn the arnoun <br /> A. When CONTRACTOR considers the entire <br /> paragraph 14.02.D-beseme due, and when Work ready for its intended use CONTRACTOR shall <br /> Cd I--e�.A f i I 1 -he paid by OWNER to CONTRACTOR. notify OWNER and ENGINEER in writing that the <br /> entire Work is substantially complete (except for items <br /> D. Reduction in Payment specifically listed by CONTRACTOR as incomplete) <br /> and request that ENGINEER issue a certificate of <br /> 1. OWNER may refuse to make Substantial Completion. Promptly thereafter, <br /> payment of the full amount recommended by OWNER, CONTRACTOR, and ENGINEER shall <br /> ENGINEER because: make an inspection of the Work to determine the <br /> status of completion. If ENGINEER does not consider <br /> a. claims have been made against the Work substantially complete, ENGINEER will <br /> OWNER on account of CONTRACTOR's notify CONTRACTOR in writing giving the reasons <br /> performance or furnishing of the Work; therefore. If ENGINEER Gensiders the Work <br /> p mmplet{ , F_=N1 `rviN1E=F_=Q` ��ii�pFeeparcRe and <br /> b. Liens have been filed in connection deliver to OWNER a tentative GeFtifiGate of Substa <br /> with the Work, except where Comp etionvVhin"r shall fie-date ofSubsta,�tia; <br /> CONTRACTOR has delivered a specific So;p e'tion.There shall be a*o.Ghed to the Gertif,i <br /> Bond satisfactory to OWNER to secure the a tentative fist of items to he eompleterl er ,.,,rre„+er1 <br /> satisfaction and discharge of such Liens; before final payment. CANNER shall have seven-days <br /> after receipt of the tentative nertifinate during which to <br /> c. there are other items entitling OWN- m, tee-written-objeGfi^non-to-ENGINEER-as to arty <br /> ER to a set-off against the amountp isiensAf f�Gert fir-ate er attaGhed list. if, <br /> recommended; or <br /> that—the—his not—substan+,substantially GGIMpiete- <br /> d. OWNER has actual knowledge of the Gnlr_INIGGR Will m4thin 14 mays after s, hmiccien of the <br /> occurrence of any of the events enumerated <br /> in paragraphs 14.02.B.5.a through inwriting, stating the reasens-therefer.if, a#tc� <br /> 14.02.B.5.c or paragraph 15.02.A. r--ens'deraflen of QIXNER's objest�RS, ENGIN <br /> Gensiders the Warp 161-1bstantia11y—complete; <br /> 2. If OWNER refuses to make payment ENGINEER will within said 14 days exeGlAte and <br /> of the full amount recommended by deliver +e nWNFR incl CONTRACTOR a dt=fipitive <br /> ENGINEER, OWNER must give <br /> CONTRACTOR immediate written notice (with tentative list of items to he eemple+ed or eorreeted) <br /> a copy to ENGINEER) stating the reasons for refleetlng Sieh ohangee from the tentative eertifinate <br /> such action and promptly pay CONTRACTOR as ENGINEER believes justified after eonsideratie of <br /> any amount remaining after deduction of the any objeGtiens-fromQ-14NTER. At the fime AfDelivery <br /> amount so withheld. OWNER shall promptly of the tentative GeFtifiGate of Substantial Gempleti <br /> pay CONTRACTOR the amount so withheld, or 1=AIGINIGGR Will deliver to nWNFR incl CONTRer_ <br /> any adjustment thereto agreed to by OWNER <br /> and CONTRACTOR, when CONTRACTOR responsibilities pending finalpayment <br /> corrects to OWNER's satisfaction the reasons ' , <br /> for such action. operat�, safety, and pretel3t , <br /> naaintenanse, heats utilities, nsaranGe and warran <br /> 3. If it is subsequently determined that and guarantees. 11nless 01AINF t and <br /> OWNER's refusal of payment was not justified, NITRACTOR agree otherwise in—writin a7 `nd se <br /> the amount wrongfully withheld shall be treated inform GNIG_INIGGR in writing prier to ENGINEER'c <br /> as an amount due as determined by paragraph <br /> 14.02.C.1. tion ENGInIGGR's aferesairl reeommenrlatien will ho <br /> 14.03 CONTRACTOR's Warranty of Title payment <br /> A. CONTRACTOR warrants and guarantees B. OWNER shall have the right to exclude <br /> that title to all Work, materials, and equipment covered CONTRACTOR from the Site after the date of <br /> by any Application for Payment, whether incorporated Substantial Completion, but OWNER shall allow CON- <br /> in the Project or not, will pass to OWNER no later than TRACTOR reasonable access to complete or correct <br /> the time of payment free and clear of all Liens. items on the tentative list. <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-39 <br /> FAPublic Works1ENGINEERING DIVISION PROJECTSMio-Sandridge Driving Range Tee Renovation�Adrnirnkbid documentsW0700-General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.