My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-124A (2)
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-124A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 2:57:08 PM
Creation date
3/3/2016 10:28:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/03/2012
Control Number
2012-124A
Agenda Item Number
8.Q.
Entity Name
Ag-Scape Services
Subject
Sandridge Golf Course Driving Range Tee Renovations Contract
Project Number
1210
Bid Number
2012040
Supplemental fields
SmeadsoftID
11321
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 - Certificate of Substantial Completion <br /> Date of Issuance: 20 <br /> OWNER: Indian River County <br /> CONTRACTOR: <br /> Bid No.: 2012040 <br /> Project: Sandridge Golf Course - Driving Range Tee Renovations <br /> ENGINEER's Project No.:1210 <br /> CONTRACT FOR: Sandridge Golf Course - Driving Range Tee Renovations <br /> This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br /> to the following specified parts thereof: <br /> To- <br /> OWNER <br /> And To, <br /> CONTRACTOR <br /> The Work to which this Certificate applies has been inspected by authorized representatives of <br /> OWNER, CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br /> substantially complete in accordance with the Contract Documents on <br /> DATE OF SUBSTANTIAL COMPLETION <br /> A tentative list of items to be completed or corrected is attached hereto. This list may not be all- <br /> inclusive, and the failure to include an item in it does not alter the responsibility of <br /> CONTRACTOR to complete all the Work in accordance with the Contract Documents. The <br /> items in the tentative list shall be completed or corrected by CONTRACTOR within days <br /> of the above date of Substantial Completion. <br /> 00630-Certificate of Substantial Completion REV 04-07.doc <br /> 00630-1 <br /> F:\PublieWorks\ENGINEERING DIVISION PROJECTS\1210-Sandridge Driving Range Tee Renovation\Ndmim\bid documents\00630-Certificate of Substantial Completion <br /> REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.