My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-124A (2)
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-124A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2017 2:57:08 PM
Creation date
3/3/2016 10:28:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/03/2012
Control Number
2012-124A
Agenda Item Number
8.Q.
Entity Name
Ag-Scape Services
Subject
Sandridge Golf Course Driving Range Tee Renovations Contract
Project Number
1210
Bid Number
2012040
Supplemental fields
SmeadsoftID
11321
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Resubmittal Procedures 4. use or occupancy of the Work or any <br /> part thereof by OWNER; <br /> 1. CONTRACTOR shall make correc- <br /> tions required by ENGINEER and shall return 5. any acceptance by OWNER or any <br /> the required number of corrected copies of failure to do so; <br /> Shop Drawings and submit as required new <br /> Samples for review and approval. CON- 6. any review and approval of a Shop <br /> TRACTOR shall direct specific attention in Drawing or Sample submittal or the issuance of <br /> writing to revisions other than the corrections a notice of acceptability by ENGINEER; <br /> called for by ENGINEER on previous <br /> submittals. 7. any inspection, test, or approval by <br /> others; or <br /> 6.18 Continuing the Work <br /> 8. any correction of defective Work by <br /> A. CONTRACTOR shall carry on the Work and OWNER. <br /> adhere to the progress schedule during all disputes or <br /> disagreements with OWNER. No Work shall be 6.20 Indemnification <br /> delayed or postponed pending resolution of any <br /> disputes or disagreements, except as permitted by A. To the fullest extent permitted by Laws and <br /> paragraph 15.04 or as OWNER and CONTRACTOR Regulations, CONTRACTOR shall indemnify and hold <br /> may otherwise agree in writing. harmless OWNER, ENGINEER, ENGINEER's <br /> Consultants, and the officers, directors, partners, <br /> 6.19 CONTRACTOR's General Warranty and employees, agents, and other consultants and <br /> Guarantee subcontractors of each and any of them from and <br /> against all claims, costs, losses, and damages <br /> A. CONTRACTOR warrants and guarantees to (including but not limited to all fees and charges of <br /> OWNER, ENGINEER, and ENGINEER's Consultants engineers, architects, attorneys, and other <br /> that all Work will be in accordance with the Contract professionals and all court or arbitration or other <br /> Documents and will not be defective. dispute resolution costs) arising out of or relating to <br /> CONTRACTOR's warranty and guarantee hereunder the performance of the Work, provided that any such <br /> excludes defects or damage caused by: claim, cost, loss, or damage: <br /> 1. abuse, modification, or improper 1. is attributable to bodily injury, <br /> maintenance or operation by persons other sickness, disease, or death, or to injury to or <br /> than CONTRACTOR, Subcontractors, destruction of tangible property (other than the <br /> Suppliers, or any other individual or entity for Work itself), including the loss of use resulting <br /> whom CONTRACTOR is responsible; or therefrom; and <br /> 2. normal wear and tear under normal 2. is caused in whole or in part by any <br /> usage. negligent act or omission of CONTRACTOR, <br /> any Subcontractor, any Supplier, or any <br /> B. CONTRACTOR's obligation to perform and individual or entity directly or indirectly <br /> complete the Work in accordance with the Contract employed by any of them to perform any of the <br /> Documents shall be absolute. None of the following Work or anyone for whose acts any of them <br /> will constitute an acceptance of Work that is not in may be liable, regardless of whether or not <br /> accordance with the Contract Documents or a release caused in part by any negligence or omission of <br /> of CONTRACTOR's obligation to perform the Work in an individual or entity indemnified hereunder or <br /> accordance with the Contract Documents: whether liability is imposed upon such indemni- <br /> fied party by Laws and Regulations regardless <br /> 1. observations by ENGINEER; of the negligence of any such individual or <br /> entity. <br /> 2. recommendation by ENGINEER or <br /> payment by OWNER of any progress or final B. In any and all claims against OWNER or <br /> payment; ENGINEER or any of their respective consultants, <br /> agents, officers, directors, partners, or employees by <br /> 3. the issuance of a certificate of Sub- any employee (or the survivor or personal <br /> stantial Completion by ENGINEER or any representative of such employee) of CONTRACTOR, <br /> payment related thereto by OWNER; any Subcontractor, any Supplier, or any individual or <br /> entity directly or indirectly employed by any of them to <br /> 00700-General Conditions REV 04-07.doc <br /> 00700-25 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1210-Sandridge Driving Range Tee Renovation\Admim\bid documents\00700-General Conditions REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.