My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/26/1992
CBCC
>
Meetings
>
1990's
>
1992
>
5/26/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:31 PM
Creation date
6/16/2015 10:58:35 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/26/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 6"'b f'auE 50 <br />IL <br />pY 2,1 1, 992 <br />CHANGE <br />Distribution to: <br />Admin <br />ORDER <br />OWNER <br />❑ <br />Budget <br />ARCHITECT <br />❑ <br />AIA DOCUMENT G701 <br />CONTRACTOR <br />❑ <br />FIELD <br />❑ <br />OTHER <br />❑ <br />PROJECT: Sandridge Golf Club <br />(name, address) Indian River County <br />Vero Beach,' Fl., 32960 <br />TO (Contractor): <br />Barth Construction <br />1717 Indian River Blvd. <br />Vero Beach, F1., 32960 <br />Ln <br />CHANGE ORDER NUMBER: 1 <br />INITIATION DATE: 5-19-92 <br />ARCHITECT'S PROJECT NO: 9102 <br />CONTRACTFORClub House, Cart Storage <br />Building, Maintenance building <br />addition and two rain shelters <br />J CONTRACT DATE: 5-5-92 <br />You are directed to make the following changes in this Contract: <br />( Items 1 - 13 attached ) <br />In®2n Hiwr Cn <br />Approved Dale <br />Admin <br />f 3 -p <br />Legal <br />4 .4(-3-P7,- <br />Budget <br />-9 0— <br />Dept <br />- <br />Risk Mgr. <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />The original (Contract Sum) (Guaranteed Maximum Cost) was ........................... $709, 725.00 <br />Net change by previously authorized Change Orders ................................... $ 0 <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $709, 725.00 <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) W%=X'A 0tM*l <br />by this Change Order......................................................... $ 16,214.00 <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $725, 939.00 <br />The Contract Time will be (increased) (decreased) (unchanged) by ( 0 ) Days. <br />The Date of Substantial Completion as of the date of this Change Order therefore is 8 months f rom time of <br />C.E. Block Architect, Inc. Barth Construction Co. Authorized: permitting. <br />Indian River County <br />115�11TIS6th Avenue <br />Address <br />Vero Beach, F1. 32960 <br />CONTRACTOR <br />,1717 Indian Rivp-r Blvd. <br />Address <br />Vero each, F1. 32960 <br />ri <br />01818 25th St. <br />Address <br />Vero Beach, Fl. 32960 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 <br />12 <br />G7U1 — IVID <br />Z— <br />
The URL can be used to link to this page
Your browser does not support the video tag.