Laserfiche WebLink
ARCADIS SURVEY ESTIMATE WORKSHEET <br /> BY: W.DIVINE DATE: 4/11/2016 _ <br /> - -- CLIENT: INDIAN-RIVER-COUNTY PROJECT: 66TH AVENUE - - -- SECTION: <br /> TASK SENIOR EXPERT PROJECT ENGINEER CADD DRAFTER 2MAN 3MAN EXPENSE CLERICAL TOTAL <br /> PM WITNESS MANAGER SURVEYOR FIELD INSP. CREW CREW COST TASK <br /> PROJECT MANAGEMENT $ <br /> HEALTH AND SAFETY $ <br /> TRAVEL 4.00 70.00 $ 590.00 <br /> RUN CONTROL 1.00 4.00 $ 670.00 <br /> TOPO 296+00 TO 302+00 1.00 6.00 6.00 $ 1,458.00 <br /> TOPO 58TH STREET BRIDGE 0.50 3.00 4.00 $ 859.00 <br /> $ <br /> $ <br /> $ <br /> TOTAL HOURS 0.00 0.00 2.50 0.00 9.00 0.00 18.00 0.00 70.00 0.00 <br /> LABOR COST 175.00_[_ 195.00 150.00 115.00 88.00 75.00 130.00 180.00 1.00 55.00 <br /> TOTAL COST 1 0.00 L 0.00 375.00 0.00 792.00 0.00 2340.00 0.00 70.00 0.00 <br /> CONTRACT TYPE: LS LABOR X 1.00 FRINGE% 1.00 TOTAL $ 3,577.00 <br /> TOTAL LABOR: <br />