My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-078
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2016 11:26:56 AM
Creation date
6/3/2016 10:50:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
05/24/2016
Control Number
2016-078
Agenda Item Number
8.B.
Entity Name
Arcadis US, Inc.
Subject
Amendment No. 16 Bridge Replacements
Widening 66th Ave.
Area
South of SR 60 to North of 57th St.
Project Number
0545
Alternate Name
Arcadis G&M Inc.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLYRATE ALLOWANCES <br /> Allowance for Sketch and Legal <br /> Descriptions and staking ofparcels(375.001each)................NTE$0.00 $51,000.00 <br /> Allowance for miscellaneous roadway design <br /> changes due to right of way negotiations...............................NTE$0.00 $20,000.00 <br /> Allowance for Survey Crew and Soft Dig <br /> Machine for Horizontal and Vertical <br /> Utility Locations at Potential Conflicts <br /> (Survey$112Mr)......................................................................NTE$0.00 $20,000.00 <br /> Allowance for Survey and Design <br /> Of a transition to match the existing pavement <br /> At the north end of the project................................................NTE$0.00 $27,000.00 <br /> Construction Engineering Services-Public Works .............NTE$0.00 $92,877.12 <br /> Construction Engineering Services-Utility Dept.................. NTE$0.00 $10,446.24 <br /> Construction Engineering Services-Structural Engineer. NTE$920.00 $920.00 <br /> TOTAL HOURLY RA TE ALLOWANCES.......................NTE$920.00 $222,243.36 <br /> Compensation for the hourly rate allowances will be made on an hourly basis at the <br /> hourly rates listed below: <br /> Project Engineer Manager..............................................$146.64 <br /> Project Engineer............................................................... $109.70 <br /> Senior CADD Operator...................................................... $85.84 <br /> CaddDrafts»rarr.................................................................. $56.89 <br /> Survey Project Manager................................................... $106.40 <br /> Professional Surveyor........................................................ $98.30 <br /> SurveyCADD Tech............................................................ $68.17 <br /> 3 Man Field Crew............................................................. $126.84 <br /> 2 Man Field Crew............................................................. $114.14 <br /> Sr. Field Coordinator......................................................... $75.00 <br /> The AGREEMENT is hereby amended as specifically set forth here in. All other sections of the <br /> AGREEMENT shall remain in full force and effect and are incorporated herein. <br /> Page 5 of 6 <br /> G.\LNR Support\Proposals\WPB\2016\66th Avenue\66th Avenue AVE AMENDMENT 4-25-16 doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.