Laserfiche WebLink
HOURLYRATE ALLOWANCES <br /> Allowance for Sketch and Legal <br /> Descriptions and staking ofparcels(375.001each)................NTE$0.00 $51,000.00 <br /> Allowance for miscellaneous roadway design <br /> changes due to right of way negotiations...............................NTE$0.00 $20,000.00 <br /> Allowance for Survey Crew and Soft Dig <br /> Machine for Horizontal and Vertical <br /> Utility Locations at Potential Conflicts <br /> (Survey$112Mr)......................................................................NTE$0.00 $20,000.00 <br /> Allowance for Survey and Design <br /> Of a transition to match the existing pavement <br /> At the north end of the project................................................NTE$0.00 $27,000.00 <br /> Construction Engineering Services-Public Works .............NTE$0.00 $92,877.12 <br /> Construction Engineering Services-Utility Dept.................. NTE$0.00 $10,446.24 <br /> Construction Engineering Services-Structural Engineer. NTE$920.00 $920.00 <br /> TOTAL HOURLY RA TE ALLOWANCES.......................NTE$920.00 $222,243.36 <br /> Compensation for the hourly rate allowances will be made on an hourly basis at the <br /> hourly rates listed below: <br /> Project Engineer Manager..............................................$146.64 <br /> Project Engineer............................................................... $109.70 <br /> Senior CADD Operator...................................................... $85.84 <br /> CaddDrafts»rarr.................................................................. $56.89 <br /> Survey Project Manager................................................... $106.40 <br /> Professional Surveyor........................................................ $98.30 <br /> SurveyCADD Tech............................................................ $68.17 <br /> 3 Man Field Crew............................................................. $126.84 <br /> 2 Man Field Crew............................................................. $114.14 <br /> Sr. Field Coordinator......................................................... $75.00 <br /> The AGREEMENT is hereby amended as specifically set forth here in. All other sections of the <br /> AGREEMENT shall remain in full force and effect and are incorporated herein. <br /> Page 5 of 6 <br /> G.\LNR Support\Proposals\WPB\2016\66th Avenue\66th Avenue AVE AMENDMENT 4-25-16 doc <br />