My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
10/13/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 10:09:00 AM
Creation date
6/20/2016 2:09:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/13/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
415
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />No. 2015-003 <br />IRC — Water Main Loop Completions to Serve the Highlands and Falcon Trace <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: October 2015 EFFECTIVE DATE: November 2015 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT. BID NO. 2015001. AWARDED <br />September 9. 2014 <br />PROJECT: Water Main Loops to Serve the Highlands and Falcon Trace <br />COUNTY UTILITY PROJECT NO.: UCP #4096 CONTRACTOR'S PROJECT NO.: N/A <br />COUNTY WIP. No. 47123536-044699-15508.471-169000-15507,471-169000-15509 <br />You are directed to proceed promptly with the following work: <br />Description: Construct 6" and 8" PVC and FIDPE water mains loop completions on 20'1i Avenue SW and 2151 <br />Street SW as outlined in the Cost Estimate. <br />Attachments: (List documents supporting work) <br />Method of determining Contract Price: <br />m Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of County <br />Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />❑ Lump Sum <br />D Cost oft the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Estimated Labor Cost (rounded) = $101,954.60 <br />Estimated Contract Time: 60 days <br />Estimated Labor Cost (rounded). $101,954.60 <br />ACCEPTED: RECOMMENDED: <br />By: <br />Blue Goose Construction <br />Labor Contractor <br />it'• J <br />Date: (,I 4 L 1 f� J <br />Environmental Engineer <br />Date: ��30� /gam <br />APPROVED: <br />By: <br />COUNTY, CHAIRMAN <br />Wesley S. Davis <br />Date: <br />Attachment 2 <br />C`\Users•lcrain'AppData\l..ocaI'Microsoii\Windows\Temportu Interim Files`Content.Outlook'JTNOMD9Fl0A - Work Authorization No 2015-003 <br />WM loops on 20 AV and 21st St SW.doc <br />88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.