Laserfiche WebLink
WORK AUTHORIZATION DIRECTIVE <br />No. 2015-003 <br />IRC — Water Main Loop Completions to Serve the Highlands and Falcon Trace <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: October 2015 EFFECTIVE DATE: November 2015 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT. BID NO. 2015001. AWARDED <br />September 9. 2014 <br />PROJECT: Water Main Loops to Serve the Highlands and Falcon Trace <br />COUNTY UTILITY PROJECT NO.: UCP #4096 CONTRACTOR'S PROJECT NO.: N/A <br />COUNTY WIP. No. 47123536-044699-15508.471-169000-15507,471-169000-15509 <br />You are directed to proceed promptly with the following work: <br />Description: Construct 6" and 8" PVC and FIDPE water mains loop completions on 20'1i Avenue SW and 2151 <br />Street SW as outlined in the Cost Estimate. <br />Attachments: (List documents supporting work) <br />Method of determining Contract Price: <br />m Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of County <br />Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />❑ Lump Sum <br />D Cost oft the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Estimated Labor Cost (rounded) = $101,954.60 <br />Estimated Contract Time: 60 days <br />Estimated Labor Cost (rounded). $101,954.60 <br />ACCEPTED: RECOMMENDED: <br />By: <br />Blue Goose Construction <br />Labor Contractor <br />it'• J <br />Date: (,I 4 L 1 f� J <br />Environmental Engineer <br />Date: ��30� /gam <br />APPROVED: <br />By: <br />COUNTY, CHAIRMAN <br />Wesley S. Davis <br />Date: <br />Attachment 2 <br />C`\Users•lcrain'AppData\l..ocaI'Microsoii\Windows\Temportu Interim Files`Content.Outlook'JTNOMD9Fl0A - Work Authorization No 2015-003 <br />WM loops on 20 AV and 21st St SW.doc <br />88 <br />