My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/13/2015 (3)
CBCC
>
Meetings
>
2010's
>
2015
>
10/13/2015 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2018 10:09:00 AM
Creation date
6/20/2016 2:09:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/13/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
415
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project : Loop Completions <br />Date: October 5, 2015 <br />Indian River County Department of Utilities <br />LABOR AND MATERIALS COST ESTIMATE FROM LABOR CONTRACTOR'S BID ITEM LIST <br />LABOR CONTRACTOR - BLUE'GOOSE CONSTRUCTION <br />LABOR COST <br />MATERIALS <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />' Unit of <br />Measure <br />Labor Unit <br />Price <br />Total Labor <br />Price <br />Material Unit <br />Price <br />Total Material <br />Price <br />Totals for Labor and Materials (Separately) for Three <br />LABOR COST <br />MATERIALS <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated 1 Unit of <br />Quantity 1 Measure <br />Labor Unit <br />Price <br />Total Labor <br />Price <br />Material Unit <br />Price <br />Total Material <br />Price <br />C. 20th Avenue s/o 19th Place SW - WM Loop <br />Connection <br />0 l <br />Install 8" PVC Water Main <br />60.0 <br />LF <br />58.00 <br />$480.00 <br />$9 72 <br />$583.20 <br />07b <br />Install 8" HDPE Directional Drill including <br />Fusion of Pipe and MJ Adapters <br />100 <br />LF <br />$49.85 <br />5900.00 <br />54,985.00 <br />$12.43 <br />51,500.00 <br />$1 243.00 <br />000.00 <br />16a <br />Install SS Wet Tap Assemb. w/ Gate Valve 6" X <br />6" and Tap Main <br />2 <br />EA.$1,800.00$3 <br />23 <br />Test Holes / Potholes <br />15 <br />EA. _ <br />5250.00 <br />$1.50 <br />$3,750.00 <br />$240.00 <br />$100.00 <br />$100.00 <br />29a <br />Fill Pressure Test, Chlorinate Flush 6" Water Ms <br />160 <br />LF <br />30b <br />mstan sampte rant per t,ounty uetau, Kemove <br />After FDEP Clearance <br />2 <br />EA. <br />$275.00 <br />$550.00 <br />$400.00 <br />— <br />$800.00 <br />30c <br />Take Bacterial Sample/Deliver to Lab for Testing <br />4 <br />EA. <br />$150.00 <br />$600.00 <br />09 <br />Install Mechanical Restrained Joint DI Fittings <br />0.50 <br />TON <br />$4,100.00 <br />$2,050.00 <br />$4,100.00 <br />52 050.00 <br />86a <br />Lawn Restoration Topsoil & Sod (St. Augustine) <br />400 <br />SY <br />$2'25 <br />5900.00 <br />$1'50 <br />5600.00 <br />Subtotal <br />Subtotal Labor and Materials <br />$15,355.00 <br />$1 535.50 <br />$8 376.20 <br />91 <br />Mobilization, Demobilization, MOT <br />1 <br />10% <br />Subtotal <br />—r°t, e — <br />Subtotal Water System Labor, Mob., Demob., <br />MOT and Materials <br />$16,890.50 <br />$8,376.20 <br />IRCDUS Contingency Account <br />1 <br />10% <br />51 689.05 <br />5837.62 <br />Subtotals for Labor and Materials <br />518,579.55 <br />_ <br />$9 213.82 <br />TOTAL <br />$27,793.37 <br />Totals for Labor and Materials (Separately) for Three <br />Locations <br />5101,954.60 <br />541,895.92 <br />TOTAL Project Labor and Materials for Three Locations <br />$143,850.52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.