My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/12/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
04/12/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 11:36:37 AM
Creation date
6/30/2016 11:16:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/12/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
While construction plans are considered part of the JCP application, we will request that the FDEP require <br />these as part of their Notice to Proceed item list. Development of final plans and specifications is not <br />included in this proposal. If CB&I's services are requested for these items, a separate work order will be <br />proposed to the County. <br />Aerials collected by the County in the summer of 2015 and the edge of hardbottom delineated based on <br />interpretation of those aerials will be used to support the permit application. <br />We will develop a draft construction schedule for the County's review for inclusion in the permit <br />application. <br />We will coordinate with local upland sand mines to obtain sufficient geotechnical information to support <br />the JCP application. We will develop a Sediment QA/QC plan as necessary. <br />We will describe the natural community within the project area based on the Environmental Assessment. <br />We will develop Biological, Physical, and Mitigation Monitoring plans as necessary. No additional field <br />work is proposed as part of this effort. <br />i <br />We will coordinate with the County and Ecological Associates regarding sea turtle nesting data and any <br />wildlife surveys conducted on site. This data will be incorporated into the permit application. No <br />additional field work is proposed as part of this effort. <br />We anticipate that this project can be covered by the Statewide Programmatic Biological Opinion (SPBO). <br />We will coordinate with USFWS regarding any additional information required to apply the Biological <br />Opinion. The SPBO does not include consultation on piping plovers. Separate consultation on piping <br />plovers may be required. It is anticipated that consultation with National Marine Fisheries Service (NMFS) <br />will be required in order to determine appropriate reasonable and prudent measures, terms and <br />conditions and conservation measures for sea turtles, smalltooth sawfish, loggerhead critical habitat and <br />listed coral species. <br />We will explain how the project will affect the coastal system. It is envisioned that the Preliminary Project <br />Design and Feasibility Report will provide much of the support for this portion of the permit application <br />discussion. <br />We will describe the envisioned construction methodology and how turbidity control measures will be <br />instituted to minimize adverse effects to water quality. We will also explain methods to protect threatened <br />and endangered species. <br />The County will be responsible for the JCP application fee. This cost is not included in CB&I's cost for <br />this work. <br />We will follow guidance provided by the FDEP with respect to the filing convention and submittal <br />requirements. We will follow-up with the FDEP to ensure receipt and distribution of the JCP application. <br />We will also document the timeline for review and attempt to provide unofficial responses when and <br />where possible to avoid Requests for Additional Information. <br />200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.