My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/19/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
04/19/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 11:38:18 AM
Creation date
6/30/2016 11:57:06 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/19/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Program Costs- Expenses for construction coordination, preparing work write-ups, conducting <br />housing inspections, and quality control monitoring of projects. Actual contractor cost for project <br />construction will likewise be charged as program cost. Direct costs: Activities or services that benefit <br />a specific project. For example: project specific construction costs, materials, and inspections. <br />Administrative Costs- Administrative expenses (not to exceed 10% or $19,400) incurred for <br />managing the program includes the costs that are not project -specific, but are necessary and <br />contribute to the overall progression of the program. Indirect Costs: Costs related to for example: <br />Contractual Services for program management, utilities, rent, and miscellaneous supplies purchased <br />in bulk <br />- <br />if -4rev:h' <br />Other Direct Costs- Printing and copying will be required for outreach materials (flyers, brochures, <br />etc.) and application materials(application and supporting docmentation) that will be distributed <br />and mailed to residents. Total cost for supplies will not exceed ,% or $1,940 and <br />marketing/advertising costs will not exceed 2% or $3,880`•61AtheZAdministrative Costs. <br />Equipment- Indian River will not purchase equipme,rit,p2'fulfilI the Scope:•gf Work of the Retrofit <br />Program. Contractual Services will utilize their offce._equipment and facilities in addition to limited <br />County space for program administration, and contractors will provide all necessary equipment to <br />complete construction work. _ '- <br />• <br />.ti <br />18 <br />118 <br />
The URL can be used to link to this page
Your browser does not support the video tag.