Laserfiche WebLink
Agreement <br />Bid No. 2016025 <br />North Hobart Water Treatment Plant Membrane Replacement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) (hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree <br />as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents <br />as set firth in Article 8 of this Agreement. The Work is generally described as follows: <br />Contractor as an independent contractor and not as an employee shall furnish and complete all <br />of the necessary labor, material and equipment to perform the work as specified or indicated in <br />the Co tract Documents and per FDEP, and the Indian River County Department of Utility <br />Services standards. The work is generally described as follows: <br />The scope of work includes all work necessary to; replace existing membrane elements, including <br />removal and disposal of membrane elements, cleaning/swabbing the existing pressure vessels, <br />installation of new membrane elements, replacement of existing permeate hoses with PVC piping, <br />relocation of sample tubing, bacteriological testing, and startup and testing of new membranes <br />with existing Owner provided membrane system equipment. Work in this section shall be the <br />responsibility of a reverse osmosis (RO) membrane system integrator (OEM), including supervision <br />and direction. The work is to be performed at the North Hobart Water Treatment Plant. <br />ARTICLE 2 - THE PROJECT <br />2.01 jThe Project for which the Work under the Contract Documents may be generally described <br />as follows: <br />Project Name: North Hobart Water Treatment Plant Membrane Replacement <br />Bid Number: 2016-025 <br />Project Address: 7751 58th Avenue, Vero Beach, FL 32967. <br />ARTICLE 3 — TERM AND CONTRACT TIMES <br />3.01 <br />Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />3.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />Section 00530-1 <br />44 <br />