Laserfiche WebLink
ATKINS <br />The following deliverables will be provided to the County (Tasks 1-5, Task 3a is included in Task 3): <br />A. <br />B. <br />C. <br />D. <br />E. <br />F. <br />G. <br />H. <br />Task 1 - County coordination meeting minutes, <br />Task 2 and 3 — 30% Conceptual Roadway and Traffic Signal Plans (3 hardcopies and 1 pdf), <br />Task 4 — Notice to Utility Providers (pdf copy), <br />Task 3 — Results of SUE (pdf copy), <br />Task 2 and 3 — 75% Construction Drawings (Roadway Plans and Traffic Signal Plans), <br />Specifications and Cost Estimate (3 hardcopies and 1 pdf), <br />Task 4 — SJRWMD Permit Exemption Request (pdf copy), <br />Task 2 and 3 — 100% Construction Drawings (Roadway Plans and Traffic Signal Plans), <br />Specifications and Cost Estimate, response to County Comments. (3 hardcopies and 1 pdf), <br />Task 5 - Issue for Bid Documents (Roadway Plans and Traffic Signal Plans, Specifications <br />and Cost Estimate (3 hardcopies and 1 pdf). <br />Page 9 of 10 <br />March 23, 2016 <br />65 <br />