Laserfiche WebLink
67 <br />MAN HOUR BREAKDOWN <br />Project: <br />BY: <br />IRC - GEC - Project 1305 - CR 512 DATE: 3/23/2016 <br />Myrtle St to 125th Ave <br />JHW <br />TASK DESCRIPTION <br />PROGRAM <br />MGR <br />SR ENG III/ PM <br />SR ENG 1 <br />ENG I <br />CAD DESIGNER <br />Task 1 - Existing Conditions Review• <br />Site Visit /, project walk walk <br />8.0 <br />8.0 <br />Survey review <br />4.0 <br />County Meeting and minutes <br />2.0 <br />4.0 <br />4.0 <br />I Subtotal <br />2.0 <br />12.0 <br />8.0 <br />8.0 <br />0.0 <br />Task 2 - Roadway Plans <br />I Project Management <br />12.0 <br />70.0 <br />County Meetings (3 separate) and minutes <br />16.0 <br />Roadway Analysis and Design <br />8.0 <br />40.0 <br />8.0 <br />Utility Coordination <br />4.0 <br />20.0 <br />8.0 <br />Construdtion Drawings, CAD and Review <br />8.0 <br />12.0 <br />24.0 <br />200.0 <br />Cost Estimates (75% and 100%) <br />4.0 <br />24.0 <br />24.0 <br />Technical Specs <br />8.0 <br />24.0 <br />16.0 <br />I QAQC <br />8.0 <br />24.0 <br />24.0 <br />16.0 <br />Subtotal <br />20.0 <br />142.0 <br />144.0 <br />80.0 <br />216.0 <br />Task 3 - Signalization Plans <br />SUE (SUBCONTRACTED) <br />• I Base Mapping <br />6.0 <br />I Utility Coordination <br />4.0 <br />8.0 <br />24.0 <br />16.0 <br />Signalization Analysis and Plans <br />6.0 <br />24.0 <br />32.0 <br />72.0 <br />88.0 <br />1 Mast Arm Structural Review <br />14.0 <br />1 Signalization QAQC <br />4.0 <br />8.0 <br />24.0 <br />8.0 <br />18.0 <br />I Subtotal <br />10.0 <br />50.0 <br />64.0 <br />104.0 <br />128.0 <br />Task 3a - Strain Pole Structural <br />SUE <br />(SUBCONTRACTED) <br />Strain Pole Utility Coordination <br />2.0 <br />6.0 <br />4.0 <br />8.0 <br />Strain Pole Analysis and Design <br />1.0 <br />4.0 <br />12.0 <br />16.0 <br />8.0 <br />Strain Pole QAQC <br />1.0 <br />2.0 <br />4.0 <br />4.0 <br />4.0 <br />Subtotal <br />2.0 <br />8.0 <br />22.0 <br />24.0 <br />20.0 <br />Task 4 - <br />Permitting <br />IRC - 30 %Submital <br />4.0 <br />4.0 <br />8.0 <br />IRC - 75 %Submital <br />12.0 <br />6.0 <br />24.0 <br />I IRC - 100 %Submital <br />6.0 <br />8.0 <br />8.0 <br />SJRWMD exemption request <br />2.0 <br />4.0 <br />2.0 <br />I NTUP Notice and coord meeting <br />4.0 <br />8.0 <br />8.0 <br />I Subtotal <br />0.0 <br />28.0 <br />30.0 <br />8.0 <br />42.0 <br />Task 5 - Bid Phase Services <br />IFB (Dwgs, specs, bid schedule, cost estirr <br />2.0 <br />14.0 <br />16.0 <br />8.0 <br />Pre Bid Meeting <br />8.0 <br />8.0 <br />Bid RFI's <br />8.0 <br />8.0 <br />Bid Review and Recommendation <br />8.0 <br />16.0 <br />Subtotal <br />2.0 <br />38.0 <br />48.0 <br />0.0 <br />8.0 <br />TOTAL HOURS <br />36 0 <br />278 0 <br />316 0 <br />224 0 <br />414 0 <br />67 <br />