My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-091A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-091A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2016 1:11:12 PM
Creation date
7/11/2016 1:11:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/14/2016
Control Number
2016-091A
Agenda Item Number
8.B.
Entity Name
SRS Services LLC
Subject
Repairs and improvements
Golf Cart Concrete Paths
Area
Sandridge Golf Club 5300 73rd St.
Bid Number
2016040
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2016040-Cart Path Repairs <br /> D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having done so) all <br /> additional or supplementary examinations, investigations, explorations, tests, studies, and data <br /> concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the <br /> Site which may affect cost, progress, or performance of the Work or which relate to any aspect of <br /> the means, methods, techniques, sequences, and procedures of construction to be employed by <br /> CONTRACTOR, including applying the specific means, methods, techniques, sequences, and <br /> procedures of construction, if any, expressly required by the Contract Documents to be employed <br /> by CONTRACTOR,and safety precautions and programs incident thereto. <br /> E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, <br /> studies, or data are necessary for the performance of the Work at the Contract Price, within the <br /> Contract Times, and in accordance with the other terms and conditions of the Contract <br /> Documents. <br /> F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at <br /> the Site that relates to the Work as indicated in the Contract Documents. <br /> G. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br /> observations obtained from visits to the Site, reports and drawings identified in the Contract <br /> Documents, and all additional examinations, investigations, explorations, tests, studies, and data <br /> with the Contract Documents. <br /> H. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies <br /> that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof <br /> by OWNER is acceptable to CONTRACTOR. <br /> I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms <br /> and conditions for performance and furnishing of the Work. <br /> ARTICLE 8-CONTRACT DOCUMENTS <br /> 8.1 Contents <br /> A. The Contract Documents consist of the following: <br /> 1 This Agreement(pages 1 to 7 inclusive); <br /> 2. Notice to Proceed <br /> 3. Certificate of Liability Insurance <br /> 4. Addenda(numbers to , inclusive); <br /> 5. CONTRACTOR'S Bid Form(pages to of , inclusive); <br /> 6. Bid Bond(pages inclusive); <br /> 7. Affidavit of Compliance(page of ); <br /> Page 25 of 31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.