My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-106
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2016 11:25:01 AM
Creation date
7/14/2016 11:13:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Application
Approved Date
07/12/2016
Control Number
2016-106
Agenda Item Number
8.S.
Entity Name
Inwater Research Group Marine Conservation
Subject
Sea Turtle Education Grant
Florida Traveling Turtles
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wheeled trunk (23" H x 37 L x 23 W) <br /> Foam inserts (can be pulled apart to-fit skulls) <br /> Sea turtle skulls (5) <br /> Prey items (jellyfish, blue crab*, sea grass, sponge*, conch*) <br /> Model turtles (flipper-tagged)* <br /> Calipers (10) <br /> Insulating foam <br /> Dive weight beads (3 Ib. bag) <br /> Acrylic;paint* <br /> Faux fur for"algae"* <br /> Barnacles (preserved and sealed)* <br /> Scale <br /> Ping pong balls (40)* <br /> Measuring tapes (12)* <br /> Lesson binder* <br /> Trunk decals* <br /> DVD with recreation instructions and training material* <br /> Certain items will ship from the business of purchase. All items with an * will be shipped from <br /> IRG. Items may come separately. You must supply an address that can receive shipments <br /> after hours. <br /> Reporting <br /> Organizations will be required to report back on July 1St of each year with the following: <br /> 1. Program Demographics Reporting spreadsheet (provided) <br /> 2. Teacher surveys <br /> 3. Photos (if possible) <br /> 4. List of events, workshops at which the program was presented (if applicable) <br /> 5. Copies of print mention of program (e.g. social media, newsletters, e-blasts) <br /> i <br /> Timeline <br /> YEAR 1 <br /> July 2016 <br /> • Organizations will be notified of their selection <br /> • IRG will contact project leader to discuss questions, concerns, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.