My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-096
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 10:12:45 AM
Creation date
8/8/2016 10:02:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/21/2016
Control Number
2016-096
Agenda Item Number
8.D.
Entity Name
Florida Department of Transportation
Subject
Construction of sidewalk and drainage modifications
Area
North side of 8th St. from 58th Ave. to 21st. Cout
Document Relationships
2016-055
(Attachment)
Path:
\Resolutions\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' 1 STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION <br /> 525-010-c0 <br /> LOCAL AGENCY PROGRAM AGREEMENT PROGRAM MANAGEMENT <br /> OGC-08115 <br /> Page 1 <br /> EXHIBIT "A" <br /> PROJECT DESCRIPTION AND RESPONSIBILITIES <br /> FPN: 431733-1-58/68-01 <br /> This exhibit forms an integral part of the Local Agency Program Agreement between the State of Florida, Department of <br /> Transportation and <br /> Indian River Countv <br /> PROJECT LOCATION: <br /> ❑The project is on the National Highway System. <br /> ❑The project is on the State Highway System. <br /> PROJECT LENGTH AND MILE POST LIMITS:2.449 Miles <br /> PROJECT DESCRIPTION 81h St. Sidewalk Improvements from 58th Ave. to 2111 Ct. <br /> SPECIAL CONSIDERATIONS BY AGENCY: <br /> The audit report(s) required in the Agreement shall include a Schedule of Project Assistance that will reflect the <br /> Department's contract number, the Financial Project Number (FPN), the Federal Authorization Number (FAN), where <br /> applicable, the amount of state funding action (receipt and disbursement of funds), any federal or local funding action, and <br /> the funding action from any other source with respect to the project. <br /> The Agency is required to provide a copy of the design pians for the Department's review and approval to coordinate <br /> permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br /> The Agency shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br /> accordance with the following schedule: <br /> a)Study to be completed by N/A . <br /> b) Design to be completed by N/A <br /> c) Right-of-Way requirements identified and provided to the Department by N/A <br /> d) Right-of-Way to be certified prior to advertising for construction (All Phase 58 LAPS) <br /> e)Construction contract to be let by 11/04/2016 - <br /> f) Construction to be completed by 6/30/2018 . <br /> If this schedule cannot be met, the Agency will notify the Department in writing with a revised schedule or the project is <br /> subject to the withdrawal of federal funding. <br /> SPECIAL CONSIDERATIONS BY DEPARTMENT: N/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.