My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-096
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 10:12:45 AM
Creation date
8/8/2016 10:02:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/21/2016
Control Number
2016-096
Agenda Item Number
8.D.
Entity Name
Florida Department of Transportation
Subject
Construction of sidewalk and drainage modifications
Area
North side of 8th St. from 58th Ave. to 21st. Cout
Document Relationships
2016-055
(Attachment)
Path:
\Resolutions\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAP Performance Evaluation <br /> January 2016 <br /> Select One S) The Agency provided an independent in-house staff hour estimate to the Department prior <br /> to negotiations. (Tied to LAP Professional Services Checklist: Independent Staff Hour <br /> Estimates) <br /> 1 The Agency did not provide an independent in-house staff hour estimate prior to <br /> negotiations. <br /> 2 The Agency provided an independent in-house staff hour estimate prior to negotiations <br /> after Department follow-up. <br /> 3 The Agency provided an independent in-house staff hour estimate prior to negotiations <br /> without Department follow-up. <br /> Select One 6) The Agency's draft contract contained all federal and state requirements. (Note: Each item <br /> under Requirement 6 is considered a separate requirement. (Tied to LAP Professional <br /> Services Checklist: Required Forms, Compliance with State and Federal Contracting <br /> Requirements, and Disadvantaged Business Enterprise (DBE) and Bid Opportunity List)) <br /> 1 The Agency's draft contract was missing three or more of the required items and/or <br /> multiple revisions of the document were required. <br /> 2 The Agency's draft contract was missing less than three of the required items and <br /> minimal revisions of the document were required. <br /> 3 The Agency's draft contract contained all federal and state requirements upon initial <br /> review. No revisions were required. <br /> Select One 7) The Agency uploaded required Professional Services related documents into LAPIT. <br /> Required documents include: advertisement, shortlist and scoring sheets, man-hour <br /> estimate, proof of negotiations,federal forms, executed copy of the professional services <br /> agreement, and Professional Services Checklist. <br /> 1 The Agency did not utilize LAPIT and/or required constant follow-up from the <br /> Department to use LAPIT. <br /> 2 The Agency utilized LAPIT and entered documents with minimal prompting by the <br /> Department. <br /> 3 The Agency utilized LAPIT and entered documents and data without prompts by the <br /> Department. <br /> select one 8) The Agency set-up the "Local Agency Contract"for the consultant in LAPIT prior to the start <br /> of the project. <br /> 1 The Agency never set-up a "Local Agency Contract"in LAPIT and/or set-up after project <br /> start following constant follow-up from the Department. <br /> 2 The Agency set-up the "Local Agency Contract"in LAPIT, prior to the start of the project <br /> with minimal follow-up from the Department. <br /> 3 The Agency set-up the "Local Agency Coritract"in LAPIT prior to the start of the project <br /> without follow-up from the Department. <br /> Total 0 <br /> Count 0 <br /> Average NaN <br /> Page 2 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.