My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-096
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2016 10:12:45 AM
Creation date
8/8/2016 10:02:19 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/21/2016
Control Number
2016-096
Agenda Item Number
8.D.
Entity Name
Florida Department of Transportation
Subject
Construction of sidewalk and drainage modifications
Area
North side of 8th St. from 58th Ave. to 21st. Cout
Document Relationships
2016-055
(Attachment)
Path:
\Resolutions\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 575-095-05 <br /> LAP CERTIFICATION RIGHT OF WAY <br /> ,v,2 <br /> R/W ITEM/SEGMENT NO.: WA MANAGING DISTRICT: 4 <br /> CONSTRUCTION ITEM/SEGMENT NO.: 431733-1-58-01 STATE ROAD- N/A <br /> F.A.P. NO.(Construction): SRTS-254-A DESCRIPTION: Construction of a 5'wide <br /> COUNTY: INDIAN RIVER concrete sidewalk and minor drainage <br /> LETTING DATE: IDlrOljla modifications along 8th Street <br /> The undersigned hereby certifies as follows: <br /> Title to all property and easements needed for the above construction project is vested in the Florida Department of <br /> Transportation(Department)or a state or local government. Sufficient authority has been obtained to construct and <br /> maintain the proposed improvements on property and easements owned by state or local governments. Further: <br /> Acquisition <br /> ® Right of way was not acquired for this project. <br /> ❑ Right of way was acquired for this project in compliance with applicable state and federal law. <br /> Relocation <br /> ® No persons or businesses were required to move or move personal property from the project right of way. <br /> ❑ All persons and businesses that were required to move or move personal property from the project right of way have <br /> been provided relocation assistance in compliance with applicable state and federal law. <br /> Demolition <br /> © No structures or improvements, including encroachments, required removal from the project right of way. - <br /> E] All structures and/or improvements,including encroachments, have been removed from the project right of way in <br /> compliance with applicable state and federal law,or will be included in the construction contract. <br /> Asbestos Abatement <br /> ® No structures or improvements requiring asbestos abatement were located on the project right of way. <br /> ❑ Asbestos abatement of buildings and/or structures, including those to be removed by the construction contractor, has <br /> been completed in compliance with applicable state and federal law, or will be included in the construction contract. <br /> Submitted by Local Agency: r�:%� �✓' /?�d� /—°� 6 <br /> Title: Ro ay codt0aio anager Date: <br /> Certified by FDOT: <br /> U <br /> Al- <br /> T1 tle: s Day, istxiet igh of Way Manager Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.