My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
General Decision Number: FL160019 01/08/2016 FL19 <br /> Superseded General Decision Number: FL20150019 <br /> State: Florida <br /> Construction Type: Building <br /> County: Indian River County in Florida. <br /> BUILDING CONSTRUCTION PROJECTS (does not include single family <br /> homes or apartments up to and including 4 stories) . <br /> Note: Under Executive Order (EO) 13658, an hourly minimum wage <br /> of $10.15 for calendar year 2016 applies to all contracts <br /> subject to the Davis-Bacon Act for which the solicitation was <br /> issued on or after January 1, 2015. If this contract is covered <br /> by the E0, the contractor must pay all workers in any <br /> classification listed on this wage determination at least <br /> $10. 15 (or the applicable wage rate listed on this wage <br /> determination, if it is higher) for all hours spent performing <br /> on the contract in calendar year 2016. The EO minimum wage rate <br /> will be adjusted annually. Additional information on contractor <br /> requirements and worker protections under the EO is available <br /> at www.dol.gov/whd/govcontracts. <br /> Modification Number Publication Date <br /> 0 01/08/2016 <br /> ENGI0487-009 07/01/2013 <br /> Rates Fringes <br /> OPERATOR: Mechanic. . . . . . . . . . . . . .$ 28 .32 8 .80 <br /> OPERATOR: Oiler. . . . . . . . . . . . . . . . .$ 22. 99 8 .80 <br /> OPERATOR: Boom Truck <br /> All Tower Cranes (Must <br /> have 2 operators) Mobile, <br /> Rail, Climbers, Static- <br /> Mount; All Cranes with <br /> Boom Length 150 Feet & <br /> Over (With or without jib) <br /> Friction, Hydro, Electric <br /> or Otherwise; Cranes 150 <br /> Tons & Over (Must have 2 <br /> operators) ; Cranes with 3 <br /> Drums (When 3rd drum is <br /> rigged for work) ; Gantry & <br /> Overhead Cranes; Hydro <br /> Cranes Over 25 Tons but <br /> not more than 50 Tons <br /> (Without <br /> Oiler/Apprentice) ; <br /> Hydro/Friction Cranes <br /> without Oiler/Apprentices <br /> when Approved by Union; & <br /> All Type of Flying Cranes. . .$ 29.05 8.80 <br /> Cranes with Boom Length <br />
The URL can be used to link to this page
Your browser does not support the video tag.