My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jurisdiction in which the project is located. <br /> F. Bidder must provide a copy of its detailed "Schedule of Values"complying with <br /> requirements specified in Division 01, Section 012900. <br /> 3.02 Each bid must contain evidence of Bidder'sq ualification to do business in the state <br /> where the Project is located or covenant to obtain such qualification prior to award <br /> of the contract. <br /> 3.03 The OWNER reserves the right to reject bids from Bidders that are unable to meet <br /> the listed required qualifications. <br /> ARTICLE 4- EXAMINATION OF BIDDING DOCUMENTS, OTHER RELATED DATA, AND SITE <br /> 4.01 Subsurface and Physical Conditions <br /> A. The Supplementary Conditions identify: <br /> 1. Those reports of explorations and tests of subsurface conditions at or contiguous <br /> to the Site that Engineer has used in preparing the Bidding Documents. <br /> 2. Those drawings of physical conditions in or relating to existing surface and <br /> subsurface structures at or contiguous to the Site (except Underground Facilities) <br /> that ENGINEER has used in preparing the Bidding Documents. <br /> B. Copies of reports and drawings referenced in paragraph 4.01.A will be made <br /> available by OWNER to any Bidder on request. Those reports and drawings are not <br /> part of the Contract Documents, but the "technical data" contained therein upon <br /> which Bidder is entitled to rely as provided in paragraph 4.02 of the General <br /> Conditions has been identified and established in paragraph 4.02 of the <br /> Supplementary Conditions. Bidder is responsible for any interpretation or conclusion <br /> Bidder draws from any "technical data" or any other data, interpretations, opinions or <br /> information contained in such reports or shown or indicated in such drawings. <br /> 4.02 Underground Facilities <br /> A. Information and data shown or indicated in the Bidding Documents with respect to <br /> existing Underground Facilities at or contiguous to the Site is based upon information <br /> and data furnished to OWNER and ENGINEER by OWNERs of such <br /> Underground Facilities, including OWNER,or others. <br /> 4.03 Hazardous Environmental Condition <br /> A. The Supplementary Conditions identify those reports and drawings relating to -a <br /> Hazardous Environmental Condition identified at the Site, if any, that ENGINEER has <br /> used in preparing the Bidding Documents. <br /> B. Copies of reports and drawings referenced in paragraph 4.03.A will be made available <br /> by OWNER to any Bidder on request. Those reports and drawings are not part of <br /> the Contract Documents, but the "technical data" contained therein upon' which <br /> Bidder is entitled to rely as provided in paragraph 4.06 of the General <br /> Conditions Bidder is responsible for any interpretation or conclusion Bidder draws from <br /> 00200-2 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.