My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> Minutes for the Indian River County Go-Line Transfer Hub Mandatory Pre-Bid Meeting <br /> Date May 19, 2016 <br /> Time. 10:00 am <br /> Rich Szpyrka, Indian River County Public Works begins meeting All attendees state their names <br /> and company affiliation. <br /> Mr. Szpyrka turns the meeting over to Joe Schulke <br /> Mr. Schulke reminded all attendees to make sure they sign in since the pre-bid meeting is <br /> mandatory (see Attachment B Mandatory Meeting Sign In Sheet). He provided an agenda packet <br /> (see Attachment C)for the meeting to review then the meeting will be opened up for questions The <br /> design team will attempt to answer any questions as best they can. However,a typewritten response <br /> will be submitted as an addendum and it may differ from the answers given today, if we find that our <br /> response contradicts the contract documents, or a change is necessary The questions, responses, <br /> and discussions will be typewritten and added to the agenda package. It will be submitted to all <br /> contractors as a part of addenda no. 1., <br /> Location of project <br /> The Indian River County Go-Line Transfer Hub will be located at 1225 161 Street, Vero Beach, <br /> FL 32960 The site is east of Vero Beach High school,just west of the railroad tracks. The COVB <br /> Public Works Department accesses the site and will need to do so during construction so keep <br /> this in mind. <br /> Description of Work <br /> The construction of two structures, one is a partially enclosed bus shelter with bathrooms, a <br /> storage room, an open area with vending machines, and water fountains ("Primary Building <br /> Structure"). The second is a "U" shaped open canopy structure that goes around the building <br /> ("Secondary Building Structure"). <br /> The primary building structure is about 1,732 SF, with concrete slab, block masonry walls, and <br /> pre-engineered wood roof trusses All architectural design has been completed. <br /> The exterior "U" shaped secondary building structure is about 10 FT wide and about 330 FT in <br /> length The building system needs to be designed by the contractor or designated manufacturer. <br /> This is envisioned to be a pre-manufactured type of building that will match substantially the look <br /> and elevations of the plans prepared by the architect. <br /> The project is required to comply with the "Green Commercial Building Designation Standard <br /> of the FGBC <br /> The project is funded by the Federal Transit Administration (FTA) and is subject to <br /> compliance requirements of the Buy America Act that Chris Murphy will discuss shortly <br /> Project Team <br /> The project team is listed on the cover of the plans but any questions or concerns during this bidding <br /> process need to go only to Jennifer Hyde, IRC Purchasing Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.