My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
is to be paid the higher of that rate. We will be conducting random spot interviews of laborers on <br /> site as the job progresses During these interviews we will be collecting wage rate information <br /> from an individual laborer (s) for use in comparing to the Certified Payrolls which the prime <br /> contractor will be submitting to the County for payment. The certified payrolls must conform to a <br /> standard format. <br /> Certified payrolls are required to be submitted weekly throughout the project and will be reviewed. <br /> If deficiencies are found, the Prime contractor will be notified and given an opportunity to correct <br /> the deficiencies or have their sub-contractor correct them if the certified payroll is from a sub- <br /> contractor. In addition to being submitted weekly, copies of certified payroll are to be submitted <br /> with each pay application. In the event a certified payroll is missing from a pay application, the <br /> pay application may be rejected. <br /> Job site Bulletin Board. <br /> A job site Bulletin Board is required The purpose of the Bulletin Board from a Federal Compliance <br /> perspective is to make sure that EEO,Wage and other federal requirements are posted in a place <br /> visible and easily accessible by laborers. The board will need to be posted in an area where <br /> laborers are likely to transit. <br /> Buy America: <br /> The job site is 'Buy America'. All products and materials incorporated into the construction of the <br /> project will need to be submitted as shop drawings and accompanied with a certification in <br /> conformance with Section 421. <br /> Green Commercial Building Designation Standard of the Florida Green Building Coalition, <br /> Inc. (FGBC) <br /> Be sure to review Section 018113 "Sustainable Design and Construction Requirements" located <br /> within Division 1 and Section 019113"General Commissioning Requirements"located within Division <br /> 1 This basically covers everything from recycling to the special requirements for landscaping and <br /> irrigation. These(Section 018113 specifications) are also located on the plans as well. These were <br /> provided on the plans so you can readily provide these plan sheets to your plumbing contractor, <br /> MEP's, landscaping and irrigation contractors, etc. The specifications indicate which specific credits <br /> that the contractor needs to provide documentation. It will include, in some cases, a certification <br /> letter prepared by the contractor with a reference to the FGBC credit/section and will require back <br /> up documentation. These requirements are in the specifications in the back of the plans. <br /> Commissioning requirements Construction Engineering Group (CEG) will be commissioning the <br /> project. <br /> Both of these specification sections will outline the testing you will need to perform. Typically, CEG <br /> will be witnessing the testing but you will be providing the testing and/or testing consultant. <br /> Other Comments From Design Team <br /> No additional comments from the design team. <br /> Questions <br /> See Attachment E—Questions and Responses at Pre-Bid Meeting. <br /> There were no other questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.