Laserfiche WebLink
is to be paid the higher of that rate. We will be conducting random spot interviews of laborers on <br /> site as the job progresses During these interviews we will be collecting wage rate information <br /> from an individual laborer (s) for use in comparing to the Certified Payrolls which the prime <br /> contractor will be submitting to the County for payment. The certified payrolls must conform to a <br /> standard format. <br /> Certified payrolls are required to be submitted weekly throughout the project and will be reviewed. <br /> If deficiencies are found, the Prime contractor will be notified and given an opportunity to correct <br /> the deficiencies or have their sub-contractor correct them if the certified payroll is from a sub- <br /> contractor. In addition to being submitted weekly, copies of certified payroll are to be submitted <br /> with each pay application. In the event a certified payroll is missing from a pay application, the <br /> pay application may be rejected. <br /> Job site Bulletin Board. <br /> A job site Bulletin Board is required The purpose of the Bulletin Board from a Federal Compliance <br /> perspective is to make sure that EEO,Wage and other federal requirements are posted in a place <br /> visible and easily accessible by laborers. The board will need to be posted in an area where <br /> laborers are likely to transit. <br /> Buy America: <br /> The job site is 'Buy America'. All products and materials incorporated into the construction of the <br /> project will need to be submitted as shop drawings and accompanied with a certification in <br /> conformance with Section 421. <br /> Green Commercial Building Designation Standard of the Florida Green Building Coalition, <br /> Inc. (FGBC) <br /> Be sure to review Section 018113 "Sustainable Design and Construction Requirements" located <br /> within Division 1 and Section 019113"General Commissioning Requirements"located within Division <br /> 1 This basically covers everything from recycling to the special requirements for landscaping and <br /> irrigation. These(Section 018113 specifications) are also located on the plans as well. These were <br /> provided on the plans so you can readily provide these plan sheets to your plumbing contractor, <br /> MEP's, landscaping and irrigation contractors, etc. The specifications indicate which specific credits <br /> that the contractor needs to provide documentation. It will include, in some cases, a certification <br /> letter prepared by the contractor with a reference to the FGBC credit/section and will require back <br /> up documentation. These requirements are in the specifications in the back of the plans. <br /> Commissioning requirements Construction Engineering Group (CEG) will be commissioning the <br /> project. <br /> Both of these specification sections will outline the testing you will need to perform. Typically, CEG <br /> will be witnessing the testing but you will be providing the testing and/or testing consultant. <br /> Other Comments From Design Team <br /> No additional comments from the design team. <br /> Questions <br /> See Attachment E—Questions and Responses at Pre-Bid Meeting. <br /> There were no other questions. <br />