My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C <br /> AGENDA,MEETING OUTLINE AND NOTES FROM <br /> INDIAN RIVER COUNTY GO-LINE TRANSFER HUB <br /> MANDATORY PRE-BID MEETING <br /> MAY 19,2016-10:00 AM <br /> IRC BID NO.:2016019 <br /> 1.0 GENERAL <br /> A. The pre-bid meeting is mandatory. <br /> B. Attendance/sign in sheet—make sure you sign in. <br /> C Format of this meeting. An agenda packet has been prepared for this meeting. <br /> Please make sure you obtain a copy <br /> 1. Review the information in this packet. <br /> 2. Open up the meting for questions. <br /> D The design team will attempt to answer any questions at today's meeting. <br /> However,a typewritten response will also be provided. The typewritten response <br /> could differ from what is told to you today,if we find that our response contradicts <br /> the contract documents,or a change is necessary. The questions,responses,and <br /> discussions will be typewritten and added to the back of this agenda package_ It <br /> will be submitted to all contractors as a part of addenda no.1. <br /> 1.01 LOCATION OF WORK <br /> The Indian River County Go-Line Transfer Hub will be boated at 1225 16°f Street,Vero <br /> Beach,FL 32960. <br /> 1.02 DESCRIPTION OF WORK <br /> 1. The construction of one enclosed/partially enclosed habitable single story <br /> structure,several exterior roof covered pre-manufactured structures, and all <br /> associated site work[The Disadvantaged Business Enterprise goal for this <br /> project is 2.2%or greater): <br /> a 1,732 SF single story structure constructed with a concrete slab on grade <br /> with a monolithic concrete foundation,concrete block masonry walls and <br /> pre-engineered wood roof trusses. All architectural design has been <br /> provided by IRC(owner) <br /> b. 3,410 SF+/- exterior roof covered, pre-manufactured building structure(s) <br /> approximately 1 OFT+/- width and with a total length of 330 FT +/-, lying <br /> in an irregular / non- linear shape. Preliminary architectural design has <br /> been provided by IRC(owner) The building system design shall be signed <br /> and sealed by a Florida Licensed architect and/or engineer as required by <br /> the Building Department and provided by the contractor. <br /> c. Site improvements for the 1.60+/-acre site development area,together with <br /> "off-site" improvements in 16th Street,including all clearing,earthwork, <br /> paving,drainage, and utilities,sidewalks,landscaping,irrigation systems. <br /> 2. The project is required to comply with the "Green Commercial Building Designation <br /> Standard of the Florida Green Building Coalition,Inc." <br /> 3. The project is funded by the Federal Transit Administration(FTA)and is subject to <br /> compliance requirements of the Buy America Act(1982)as amended as well as other <br /> standard Federal Requirements incorporated into the contract. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.