Laserfiche WebLink
at 2:00 PM. All bids received after 2:00 PM will be returned <br /> unopened. <br /> The bid must be submitted complete with all required forms, <br /> including: <br /> 0 Bid Form <br /> o Bid Bond <br /> 0 Federal Transit Administration(FTA)Standard Contract Clauses <br /> 0 Sworn Statement on Disclosure of Relationships <br /> o Sworn Statement Under the Florida Trench Safety Act <br /> 0 Qualifications Questionnaire <br /> 0 List of Subcontractors <br /> o Certification of Non Segregation& Non Discrimination <br /> 0 Non-Collusion Affidavit <br /> 0 Certification Regarding Lobbying <br /> o Certificate of Non-Segregated Facilities <br /> 0 Drug Free Workplace Certification <br /> 0 Certification of Sublet Work <br /> o And other required documents which are included in the Contract <br /> Documents. <br /> Any questions regarding this bid must be submitted to Jennifer Hyde,IRC <br /> Purchasing Manager <br /> 1.05 TENTATIVE PROJECT TIMELINE <br /> Bids due: June 8,2016 <br /> Contract Award: Anticipated to be 30-60 days after bid <br /> Notice to Proceed: Anticipated to be 30-60 days after bid <br /> Construction: 180 days to substantial completion <br /> 210 days to obtain certificate of occupancy <br /> 1.06 PROJECT REQUIREMENTS <br /> Contractor shall pay close attention to.Section 00200"Instructions to Bidders"of the project <br /> specifications. <br /> 1.07 FEDERAL TRANSIT ADMINISTRATION(FTA)CONTRACT REQUIREMENTS <br /> Highlights: <br /> A. FTA Grant funded project <br /> B. DBE Participation <br /> C. Certified payroll/Davis Bacon <br /> D. Job site Bulletin Board <br /> E. Buy America <br /> 1.08 GREEN COMMERCIAL BUILDING DESIGNATION STANDARD OF THE FLORIDA <br /> GREEN BUILDING COALITION,INC.(FGBC) <br /> o Joseph W Schulke,P.E.,LEED AP,LEED Coordinator for owner <br /> o Construction Engineering Group,Commissioning Authority for Owner <br /> Reference: <br /> o Section 018113`Sustainable Design and Construction Requirements" <br /> located within Division 1. <br /> 3 <br />