My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Perfection Architectural Systems, Inc. <br /> 2310 Mercator Drive <br /> Orlando, FL 32807 <br /> Toll Free- 800-238-7207 <br /> Phone- 407-671-6225 <br /> Fax: 407-671-8252 <br /> General Information Email. info(c)perfectionarch.com <br /> Design Assistance Email: design .perfection arch.com <br /> Quote Request and Estimating Email estimating(a)-perfectionarch.com <br /> hftp://www.perfectionarch.com/products/pitched-roof.php <br /> Q-7. Do you mean like one of those flat roof es? This is a able end e <br /> Y � types? 9 type <br /> A-7- Yes. The flat roofed structure stypically found at the IRC school sites are similar to what the <br /> intent is for the six (6) covered walkways, which are between the seven (7) "bus stop" structures <br /> and the primary building structure. However, the"bus stop" structures will have a hipped standing <br /> seamed roof, and will have a decorative / faux column base See answer A-3 for additional <br /> description, and reference architectural drawings, including A-201 <br /> Questions and responses received after the pre-bid meeting <br /> Date Received: May 20, 2016 <br /> Q8 We will be bidding on the above referenced project and have a question with regards to the <br /> DBE participation. We are an SBA certified 8(a) Program Participant as well as a Certified DBE <br /> in Chicago, IL (see attached acceptance letters). Our question is will these certifications satisfy <br /> the DBE goal requirement for the project? <br /> A8 The DBE participation rates will be based on DBE certifications possessed by the Prime <br /> Bidder or its sub-contractors that have been issued through the State of Florida's Unified <br /> Certification Program (UCP) only (see attached flyer from the Florida Department of <br /> Transportation (FDOT) concerning the UCP) (see Attachment F) The basis of bid for the project <br /> is the lowest responsive bidder Although DBE utilization is highly encouraged and is sought <br /> after in this bid, the DBE participation rate identified in the bid advertisement or by the contractor <br /> in their bid is not a factor in identifying the lowest responsive bidder whether the DBE participation <br /> of that bidder is 0% or 100%. <br /> The County reserves the right to request documentation of and review DBE certifications claimed <br /> by the prime bidder or its sub-contractors, anytime either before or after a contract is entered into <br /> with the County. <br /> Following bid award and during construction, the Contractor will be required to apprise the County <br /> of any changes to the original sub-contractor list provided to the County in the bid documents. At <br /> any point during the construction of the project, DBE utilization will be subject to monitoring and <br /> validation. Accordingly, during the construction of the project, any change in DBE utilization via a <br /> change in either the DBE status of the prime contractor or the addition or deletion of DBE sub- <br /> contractors by the prime contractor must be reported to the County immediately. <br />
The URL can be used to link to this page
Your browser does not support the video tag.