Laserfiche WebLink
2. Perfection Architectural Systems, Inc. <br /> 2310 Mercator Drive <br /> Orlando, FL 32807 <br /> Toll Free- 800-238-7207 <br /> Phone- 407-671-6225 <br /> Fax: 407-671-8252 <br /> General Information Email. info(c)perfectionarch.com <br /> Design Assistance Email: design .perfection arch.com <br /> Quote Request and Estimating Email estimating(a)-perfectionarch.com <br /> hftp://www.perfectionarch.com/products/pitched-roof.php <br /> Q-7. Do you mean like one of those flat roof es? This is a able end e <br /> Y � types? 9 type <br /> A-7- Yes. The flat roofed structure stypically found at the IRC school sites are similar to what the <br /> intent is for the six (6) covered walkways, which are between the seven (7) "bus stop" structures <br /> and the primary building structure. However, the"bus stop" structures will have a hipped standing <br /> seamed roof, and will have a decorative / faux column base See answer A-3 for additional <br /> description, and reference architectural drawings, including A-201 <br /> Questions and responses received after the pre-bid meeting <br /> Date Received: May 20, 2016 <br /> Q8 We will be bidding on the above referenced project and have a question with regards to the <br /> DBE participation. We are an SBA certified 8(a) Program Participant as well as a Certified DBE <br /> in Chicago, IL (see attached acceptance letters). Our question is will these certifications satisfy <br /> the DBE goal requirement for the project? <br /> A8 The DBE participation rates will be based on DBE certifications possessed by the Prime <br /> Bidder or its sub-contractors that have been issued through the State of Florida's Unified <br /> Certification Program (UCP) only (see attached flyer from the Florida Department of <br /> Transportation (FDOT) concerning the UCP) (see Attachment F) The basis of bid for the project <br /> is the lowest responsive bidder Although DBE utilization is highly encouraged and is sought <br /> after in this bid, the DBE participation rate identified in the bid advertisement or by the contractor <br /> in their bid is not a factor in identifying the lowest responsive bidder whether the DBE participation <br /> of that bidder is 0% or 100%. <br /> The County reserves the right to request documentation of and review DBE certifications claimed <br /> by the prime bidder or its sub-contractors, anytime either before or after a contract is entered into <br /> with the County. <br /> Following bid award and during construction, the Contractor will be required to apprise the County <br /> of any changes to the original sub-contractor list provided to the County in the bid documents. At <br /> any point during the construction of the project, DBE utilization will be subject to monitoring and <br /> validation. Accordingly, during the construction of the project, any change in DBE utilization via a <br /> change in either the DBE status of the prime contractor or the addition or deletion of DBE sub- <br /> contractors by the prime contractor must be reported to the County immediately. <br />