38. Samples—Physical examples of communications, cable television, water, wastewater,
<br /> materials, equipment, 'or workmanship that are storm water, other liquids or chemicals,. or traffic or
<br /> representative of some portion of the Work and which other control systems."
<br /> establish the standards by which such portion of the
<br /> Work will.be_judged. 47. Unit Price Work-Work to be paid for on
<br /> the basis of unit prices.
<br /> 39.,-Shop Drawings-All drawings, diagrams,
<br /> illustrations, schedules,:and other data.or information 48. Work—The entire:completed construction
<br /> which are specifically prepared or assembled by or for or the various separately identifiable-.parts thereof re-
<br /> CONTRACTOR and.submitted by CONTRACTOR to quired to be provided under the Contract Documents.
<br /> illustrate some portion of the Work. Work, includes and is the result of- performing ,or
<br /> providing all labor,. services,- `-and documentation
<br /> 40. `Site-Lands, or areas -indicated in the necessary toproduce. such construction, and
<br /> .Contract Documents as being furnished. by OWNER furnishing, installing, and incorporating .all materials
<br /> -upon which the'Work is to. be. performed, including and equipment into such construction, all as required
<br /> .rights_-of--way and easements.for access thereto, and by the Contract Documents.
<br /> such.other lands furnished. by OWNER which are
<br /> desinated for the use of CONTRACTOR-. 49. Work Change Directive—A- written
<br /> statement.to CONTRACTOR issued on or after the
<br /> 41.-Speciftcations—That part of the Contract Effective Date, of the Agreement and signed by
<br /> Documents consisting of written technical descriptions OWNER and recommended by ENGINEER ordering
<br /> -of materials;. equipment, systems, standards, and an addition, deletion, or revision. in the Work, :or
<br /> workmanship as applied to'the Work,and certain responding to differing or unforeseen subsurface or
<br /> alliin strative.-de'tails applicable thereto_. physical"conditions-
<br /> conditions under which the Work is, to. be
<br /> performed or to _emergencies. A Work Change
<br /> 41--Siubcontractor.—An individual or entity Directive will not change the Contract Price or the
<br /> having a direct contiact.with.CONTRACTOR or with .Contract Times but'is evidence that the parties expect
<br /> :any other Subcontractor for the performance of a part that the change ordered or documented by a Work
<br /> of the Work at the Site. 'Change Directive will be incorporated in a subse-
<br /> quently issued Change Order following negotiations by
<br /> 43..Substantial Completion—The time at-- the parties as to its effect_, if any, on the Contract_Price
<br /> which the Wort- (or a specified part thereof) has or Contract Times:
<br /> progressed to "the- point where, in the' opinion or
<br /> ENGINEER,,the Work (or-a`specified part thereof) is .50. Written:Arrrendment—A written.statement
<br /> sufficiently complete, in accordance with the Contract' modifying the, Contract' Documents, signed: by
<br /> Documents, -so that the Work (or,a specified part. OWNER.and CONTRACTOR on or after the.Effective
<br /> thereof).can be utilized for tie.purposes for which it is Date'of the Agreement and-.normally dealing with,the
<br /> :intended. The terms: "substantially complete" and non-engineering or nontechnical,_rathbr ,than: strictly.
<br /> "substantially completed"'as'applied to all or part of the construction-related aspects' of the,Contract Docu-
<br /> 'Woi k-refer to Substantial Completion-.thereof: ments.
<br /> 44"._Supp%menfary Conditions-That part of 1.02- Tern7inology
<br /> the_ . Contract Documents ,which amends, or-
<br /> .supplements
<br /> r-.supplements these General Conditions. A. .Intent of Certain Terms or;Adjectives
<br /> .45..-Supplie"r.:A °manufacturer;: fabricator; 1: Whenever.in the Contract Documents the
<br /> supplier, distributor; mateeialman, or vendor having-a. terms"as allowed,"'"as approved;" or terms of like
<br /> direct contract With, _CONTRACTOR; -or -with any effect or., irnport-_are used, or the: adjectives
<br /> Subcontractor!to.furnish materials or equipment to.tie, "reasonable° "suitable;° -`acceptable," "proper,"
<br /> incorporated`in:the:-Work by CONTRACTOR'or: any "satisfactory,'',or.adjectives of:like effector. import
<br /> Subcontractor: are,used to describe-an action,or,determination-of
<br /> ENGINEER-as to the Work;itis�intended that,such
<br /> 46.. Underground: Facilities—Ail underground action"or determinatiorrwill'be;solely to evaluate; in
<br /> pipelines, -conduits; ducts; cables; rwiresi 'manholes, general, the completed_Work,for-compliance:-with
<br /> vaults; tanks,. tunnels, or other such -facilities or- the requirements of.and information in tfie Contract
<br /> attachments, and any, encasernents containing such Documents .and conformance: with the- design
<br /> "facilities_, including:those.that convey electricity; gases; concept of the completed P_roject_as_a;functioning
<br /> steam, liquid I petroleum=por roducts, telephone other whole as, shown- or indicated in the, ;Contract
<br /> 00700=Generel Conditions REV.510-13
<br /> 00700-7
<br /> F:VPubrie WaftIENGINEERING DIVISION PROJECTSM341,R.C:GoLine.Transfer HuMAdminitiid documentsWaster ContreU Documentsl00700-General Conations REV 510.13.doc'