Laserfiche WebLink
38. Samples—Physical examples of communications, cable television, water, wastewater, <br /> materials, equipment, 'or workmanship that are storm water, other liquids or chemicals,. or traffic or <br /> representative of some portion of the Work and which other control systems." <br /> establish the standards by which such portion of the <br /> Work will.be_judged. 47. Unit Price Work-Work to be paid for on <br /> the basis of unit prices. <br /> 39.,-Shop Drawings-All drawings, diagrams, <br /> illustrations, schedules,:and other data.or information 48. Work—The entire:completed construction <br /> which are specifically prepared or assembled by or for or the various separately identifiable-.parts thereof re- <br /> CONTRACTOR and.submitted by CONTRACTOR to quired to be provided under the Contract Documents. <br /> illustrate some portion of the Work. Work, includes and is the result of- performing ,or <br /> providing all labor,. services,- `-and documentation <br /> 40. `Site-Lands, or areas -indicated in the necessary toproduce. such construction, and <br /> .Contract Documents as being furnished. by OWNER furnishing, installing, and incorporating .all materials <br /> -upon which the'Work is to. be. performed, including and equipment into such construction, all as required <br /> .rights_-of--way and easements.for access thereto, and by the Contract Documents. <br /> such.other lands furnished. by OWNER which are <br /> desinated for the use of CONTRACTOR-. 49. Work Change Directive—A- written <br /> statement.to CONTRACTOR issued on or after the <br /> 41.-Speciftcations—That part of the Contract Effective Date, of the Agreement and signed by <br /> Documents consisting of written technical descriptions OWNER and recommended by ENGINEER ordering <br /> -of materials;. equipment, systems, standards, and an addition, deletion, or revision. in the Work, :or <br /> workmanship as applied to'the Work,and certain responding to differing or unforeseen subsurface or <br /> alliin strative.-de'tails applicable thereto_. physical"conditions- <br /> conditions under which the Work is, to. be <br /> performed or to _emergencies. A Work Change <br /> 41--Siubcontractor.—An individual or entity Directive will not change the Contract Price or the <br /> having a direct contiact.with.CONTRACTOR or with .Contract Times but'is evidence that the parties expect <br /> :any other Subcontractor for the performance of a part that the change ordered or documented by a Work <br /> of the Work at the Site. 'Change Directive will be incorporated in a subse- <br /> quently issued Change Order following negotiations by <br /> 43..Substantial Completion—The time at-- the parties as to its effect_, if any, on the Contract_Price <br /> which the Wort- (or a specified part thereof) has or Contract Times: <br /> progressed to "the- point where, in the' opinion or <br /> ENGINEER,,the Work (or-a`specified part thereof) is .50. Written:Arrrendment—A written.statement <br /> sufficiently complete, in accordance with the Contract' modifying the, Contract' Documents, signed: by <br /> Documents, -so that the Work (or,a specified part. OWNER.and CONTRACTOR on or after the.Effective <br /> thereof).can be utilized for tie.purposes for which it is Date'of the Agreement and-.normally dealing with,the <br /> :intended. The terms: "substantially complete" and non-engineering or nontechnical,_rathbr ,than: strictly. <br /> "substantially completed"'as'applied to all or part of the construction-related aspects' of the,Contract Docu- <br /> 'Woi k-refer to Substantial Completion-.thereof: ments. <br /> 44"._Supp%menfary Conditions-That part of 1.02- Tern7inology <br /> the_ . Contract Documents ,which amends, or- <br /> .supplements <br /> r-.supplements these General Conditions. A. .Intent of Certain Terms or;Adjectives <br /> .45..-Supplie"r.:A °manufacturer;: fabricator; 1: Whenever.in the Contract Documents the <br /> supplier, distributor; mateeialman, or vendor having-a. terms"as allowed,"'"as approved;" or terms of like <br /> direct contract With, _CONTRACTOR; -or -with any effect or., irnport-_are used, or the: adjectives <br /> Subcontractor!to.furnish materials or equipment to.tie, "reasonable° "suitable;° -`acceptable," "proper," <br /> incorporated`in:the:-Work by CONTRACTOR'or: any "satisfactory,'',or.adjectives of:like effector. import <br /> Subcontractor: are,used to describe-an action,or,determination-of <br /> ENGINEER-as to the Work;itis�intended that,such <br /> 46.. Underground: Facilities—Ail underground action"or determinatiorrwill'be;solely to evaluate; in <br /> pipelines, -conduits; ducts; cables; rwiresi 'manholes, general, the completed_Work,for-compliance:-with <br /> vaults; tanks,. tunnels, or other such -facilities or- the requirements of.and information in tfie Contract <br /> attachments, and any, encasernents containing such Documents .and conformance: with the- design <br /> "facilities_, including:those.that convey electricity; gases; concept of the completed P_roject_as_a;functioning <br /> steam, liquid I petroleum=por roducts, telephone other whole as, shown- or indicated in the, ;Contract <br /> 00700=Generel Conditions REV.510-13 <br /> 00700-7 <br /> F:VPubrie WaftIENGINEERING DIVISION PROJECTSM341,R.C:GoLine.Transfer HuMAdminitiid documentsWaster ContreU Documentsl00700-General Conations REV 510.13.doc' <br />