ments: CONTRACTOR shall at all times maintain ly will comply with any provisions of the General
<br /> good discipline and order at the Site. Requirements applicable thereto.
<br /> B. Except as otherwise required-for the.safety or 2. Proposed, adjustments- in the
<br /> protection of persons or the Work or property-at-the progress schedule that will change-the Contract
<br /> Site or adjacent thereto, -and. except. as otherwise Times (or Milestones) shall be submitted_in
<br /> stated-in the Contract Documents, all Work at the Site accordance with the requirements of Article 12.,
<br /> shall be performed during_ regular working hours, and Such adjustments-.may_ only be made by a
<br /> CONTRACTOR will not permit overtime work,:or.the Change Order or Written Amendment in accor-
<br /> performance of,Work on Saturday, Sunday, or any dance with.Article 12.
<br /> legal holiday without OWNER's written consent(which
<br /> will not .be unreasonably withheld) given ,after prior 6.05 Substitutes and"Or-Equals"
<br /> written notice to ENGINEER.
<br /> A. Whenever an item of material orequipment is
<br /> specified or describedin the Contract Documents by
<br /> 6.03 Services, Materials, and Equipment using the name of a proprietary-item,or the name of-a
<br /> particular Supplier, the specification or.description is
<br /> A. Unless otherwise specified in the General Re= intended to.establish the type, function, appearance,
<br /> quirements, CONTRACTOR shall provide and and' quality, required. Unless the specificationor
<br /> assume full re_sponsib'il_ity. for all services, materials, description contains or is followed by words reading
<br /> equipment, labor,. transportation, construction that no like; equivalent, or "or- equal" item or no
<br /> equipment and machinery, tools, appliances, fuel, substitution is permitted, other, items.of material or
<br /> power, light, heat, telephone;water, sanitary.facilities, equipment or material or equipment of other Suppliers
<br /> temporary facilities, and all other facilities and may besubmitted-to ENGINEER for r review'under the
<br /> incidentals necessary for the perfo'rrriance; testing, circu_m_stances described below;
<br /> ,start-up,and cornpletionofthe,Work:
<br /> 1-. "Or-Equal" ltemIfs- in ENGINEER's
<br /> B.. All.materials and equipment incorporated into sole dikeetion an item of.mateiia_I or equipment
<br /> the Work shall'be as specified or,'if not specified,shall proposed- by CONTRACTOR is -functionally
<br /> be of good quality .and new, except- as otherwise.. equal to that named and sufficiently similar so-
<br /> provided
<br /> oprovided in-the Contract Documents. All warranties that no change.in related Work will be required;
<br /> .and guarantees specifically called for by the Specifica-- :it 'may- lie' considered by ENGINEER as an
<br /> `tions shall expressly run to'the benefit of dWNER:_. If "or-equal" item; in :which' case. review .and
<br /> required by ENGINEER; CONTRACTOR,shall.furnish approval -of -the proposed item may, in
<br /> satisfactory. evidence (including reports of required .ENGINEER's sole Aiscretion,�be accomplished
<br /> -tests) as to.the-source,_-kind ,and quality,ofLmaterials without compliance with some or all ,of the
<br /> ,and equipment All materials and equipment shall_be, requirements for-approval of proposed substi-
<br /> stored;; -applied; installed, connected; , erected, tute-items. For the purposes of_this paragraph"
<br /> -protected; ` used,; cti
<br /> cleaned; -and, conditioned' in 6.05.A.1, _a° :proposed_4item of ,rriaterial' "or
<br /> accordance with •instruons of the', applicable- equipmeht'will be`-considered functionally'equal
<br /> Supplier,:except as,-otherwise may be provided in°the: �to'an item so named if
<br /> Co_ ntract Documents-
<br /> a. in the 'exercise• of: reasonable
<br /> -6.04 Progress Schedule judgment ENGINEER_determines that, {i):.it
<br /> ls> at least', -equal. in', quality; durability;
<br /> A., CONTRACTOR.shall adhere to the progress. appearance,, strength, and design
<br /> 'schedule established in-;accordance-with, paragraph characteristics; (ii) it;w_ill reliably perform:at
<br /> 2.07 as it may be, adjusted: timeto time as' 7 least equally well'the function imposed--by
<br /> provided below. =the-design concept.-of,-the'completed•Project
<br /> -
<br /> as,a.functioning.lrvhole;'an ;
<br /> 1. CONTRACTOR__ shall submit. to
<br /> ENGINEER for-acce'ptance:(to the e)te-nt:.indi - b: CONTRACTOR °certifies that: (i)
<br /> .catedlin paragraph 2.07-)proposed adjustments :there is no increase in-cost10 the;OWNER
<br /> in the-progress_-schedule that.. ;11'not result in and: (ii) 'it,will conform <substantially even
<br /> changing. the-Contract-Times-,(or Milestones): -with deviations,-to•the-detailed:requirements
<br /> Such adjustments-will conform generally to the• of -the item named In the" Contract
<br /> progress.schedule then.in effect•and additional- Documents.