My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2., Expenses of CONTRACTOR's princi- 2. CONTRACTOR's costs for unloading <br /> pal. and branch. offices other than and handling on the Site, labor, installation <br /> CONTRACTOR'S office at the.Site. costs, overhead, profit, and other expenses <br /> contemplated for the allowances, have been <br /> 3. Any part of CONTRACTOR's capital included in the Contract Price and not in the <br /> expenses,. including interest on allowances, and no demand for additional <br /> CONTRACTOR's capital employed for the payment on account-of any of the foregoing will <br /> Work and charges-against CONTRACTOR for be valid. <br /> delinquent payments. <br /> B. Prior to final payment, an appropriate-Change <br /> 4. Costs due to the negligence of CON- Order will be issued as recommended by ENGINEER <br /> TRACTOR, any Subcontractor, or anyone to reflect actual amounts due CONTRACTOR, on <br /> directly or indirectly employed by any of them or account of Work covered by allowances, and the Con- <br /> for whose ac_ts.any of them, may be liable; tract Price shall be correspondingly.adjusted. <br /> including but not limited to, the correction of <br /> defective Work, disposal of materials, be, 11.03 Unit Price Work <br /> equipment wrongly supplied, and making good <br /> any damage to property. A. Where,the Contract Documents provide that <br /> all or part of the Work is to be-Unit Price Work, initially <br /> 5. Other overhead-or general expense the Contract Price will be deemed to include-for-all <br /> costs of any kind and the costs of any item not Unit Price Work an amount equal to the sum of the <br /> specifically and expressly included in unit price for each separately identified item of Unit <br /> paragraphs_ 11.01.A and 11.01-.6: Price Work times the estimated quantity of each item <br /> as indicated in the Agreement.. The estimated <br /> C. CONTRACTOR's•Fee: When all the Work is. quantities of items of Unit Price Work are not guaran- <br /> performed on the basis df cost-plus,CONTRACTOR'S teed and.are solely for the'purpose of comparison of <br /> fee shall be'determined asset forth in the Agreement: Bids-and determining,-an initial Contract Price. Deter- <br /> When the value of-any Work.covered by a Change minations of the actual quantities and classifications of <br /> Order'or When:a Claim for an adjustment in Contract Unit Price Work-performed by CONTRACTOR will be <br /> Price is determined'on the,basisof Cost of the-Work; made by ENGINEER subject to -the. provisions•-of <br /> CONTRACTOR's fee shall be_detibmiined as set,forth paragraph 9.08. <br /> in paragraph 12.01.0 <br /> B.: Each unit-price'will be deemed-to.include.an <br /> D: Documentation: Whenever the Cost of the- amount considered by CONTRACTOR to be: ade- <br /> Work for any purpose:is to be,determined pursuant to quate to cover CONTRACTOR's.overhead and:profit <br /> paragraphs-1 1.01A and 11.01.B; CONTRACTOR Will for each,separately identified item: <br /> "establish'and maintain records.thereof-in accordance:. <br /> with: generally accepted accounting practices and- C, OWNER or CONTRACTOR. may, make a <br /> submit ,in. a- -form -acceptable to"ENGINEER: am Claim for-an adjustment'in'the Contract Price in actor- <br /> itemized, cost` breakdown 'together with -supporting; dance with paragraph..,10:05 if: <br /> -- <br /> 1. the quantity of-any item of Unit.Price <br /> 11.02 Cash Allowances Work- performAC <br /> ed by CONTRTOR. differs <br /> materially and signiificantly`from .the estimated <br /> A It is understood that-CONTRACTOR-_has;in-- quantity of such item indicated in the <br /> cluded in the�Contract Pnce;all allowances so'named Agreement;>and <br /> in the.Contract.Documents and shall cause the-Work <br /> so covered to be performed for such.sums-:as may be. 2.. thereis nocorrespondingadjustment <br /> acceptable to OWNER and ENGINEER. with respect`any'otheritem"ofWork;-and <br /> CONTRACTOR agrees that,. <br /> 3. if CONTRACTOR believes that <br /> 1. the°allowances include the cost to- CONTRACTOR is,entitled to an increase in <br /> CONTRACTORk (less any. applicable, -trade. Contract Price:as a result of, having incurred <br /> :discounts)_of materials and'equipment required, additional expense; or--'OWNER believes that <br /> by theallowances._to be delivered at the.Site,, OWNER is entitled to a decrease in Contract <br /> and all-applicable taxes.-and Price and the pafies are_unable to agree_as to <br /> the.amount of any such increase or decrease..- <br /> 06700'Genesi Conditi0ris REV Sii-13 <br /> FAPublic WoftXENGINEERING DIVISION PROJECTS\13304.R.C:GoUne Transfer Hublgdniinlbid documentsVA star Contrad Doouments100700-General Conditions REV 510-13:doc' <br />
The URL can be used to link to this page
Your browser does not support the video tag.