My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> tions made to check the quality or the quantity <br /> of the Work as it has been performed have theru„e^ce of any of the events c,;;,, <br /> been exhaustive, extended to every aspect of ated in paFagFaph 15.02.A. <br /> the Work in progress, or involved detailed <br /> inspections of the Work beyond the responsi- C. Payment Becomes Due <br /> bilities .specifically assigned to ENGINEER in <br /> the Contract Documents- or (ii) that there may 1. Ten day: er eseRtatien ef-the- <br /> not be other matters or issues between the <br /> parties,that might entitle CONTRACTOR to be ENGINEER'S Fewrimep the ame <br /> dation, <br /> paid,additionally by OWNER or entitle OWNER <br /> to withhold payment to CONTRACTOR. , e!Rd when <br /> dW Will be paid by QVVNER <br /> 4. Neither ENGINEER's review of <br /> CONTRACTOR's Work for the. purposes, of D. Reduction in Payment <br /> recommending payments nor ENGINEER's <br /> recommendation of any payment, including final 1.. OWNER may refuse: to make <br /> payment, will impose responsibility on payment of the full amount recommended by <br /> ENGINEER'to supervise, direct, or control the ENGINEER because: <br /> Work or,for the means, methods, techniques, <br /> sequences, or procedures of construction, or a. claims- have been made against <br /> the safety precautions and programs incident OWNER on account of CONTRACTOR's <br /> thereto; or for CONTRACTOR'S failure. to performance or furnishing of the Work; <br /> comply with Laws and Regulations applicable to <br /> CONTRACTOR's performance of the. Work. b. Liens have, been filed in connection <br /> Additionally, said review or recommendation will with the Work,. except where <br /> not impose responsibility on ENGINEER to CONTRACTOR has deliyer'eda. specific <br /> make-any examination to ascertain how or for Bond satisfactory to OWNER to secure the <br /> what..purpbses..CONTRACTOR has used the satisfaction and disc_ha_rge of such Liens; <br /> moneys paid on-account of the.Contract Price; <br /> or to'determine that title to any of-the Work; c. there are other items entitling_.OWN- <br /> materials, or equipment has pasted. to ER to a set-off against the amount <br /> OWNER free-and clear of any Liens. -recommebded;.or <br /> 5. ENGINEER may refuse to recom d. OWNER has actual knowledge of the <br /> mend'the whole or any part of any payment_if; occurrence of any of the events,enumerated <br /> in ENGINEER's opinion;it would-be incorrect-to in paragraphs 14.02.6:5:a through <br /> make the representations to OWNER referred 14.02.6.5.6 or paragraph 15.02.A. <br /> to in paragraph 14.02.6:2. ENGINEER may" <br /> also refuse to recommend any such payment; 2: If OWNER-refuses to,make payment <br /> or, because of subsequently discovered of the full amount. _ "recommended by <br /> evidence or the results of subsequent' ENGINEER,- .- OWNER :must give <br /> inspectionsor tests; revise or revoke any-.such CONTRACTOR immediate written notice(with <br /> payment recommendation previously made, to a_copy to ENGINEER) stating,the reasons for <br /> such extent as may be necessary in such action and promptly pay CONTRACTOR <br /> ENGINEER's-opinion.'to protect.,OWNER from any amount remaining after-deduction of the <br /> loss.because: amount so withheld. OWNER°shall promptly. <br /> pay CONTRACTOR:the amount so;withheld;.or <br /> a..-the Work is defective; or completed any adjustment thereto L agreed to by QWNER <br /> -Work—has—been-=damaged,—requiring and—CONTRACTOR,:when—CONTRACTOR <br /> correction or replacement; corrects,to OWNER's_satisfaction-the reasons <br /> for.such action. <br /> bathe Contract-Price has been reduced <br /> by W_ritten Am_endment_or Change Orders; 3. If it is subsequentiy determined-that <br /> OWNER's refusal of payment was.not justified, <br /> c .OWNER has been required to correct the amount wrongfully withheld-shall 66'. ated: <br /> defecfiye-Work or complete Work in actor- as.an amount due as-determined by paragraph <br /> dance witfi paragraph 11.0.9;or 14.02.C.1., <br /> 06766-General Conditions REV,5-10.13' <br /> 00700-39 <br /> F:1Pubric WorkMENGINEERING'DIVISION PROJECTSM30-IRC;GoUne Transfer HublAdminMAd documents"ster Contract DoamentsW0700=General Canditions REV 5.10-13.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.