My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION DOCUMENT INDEX: Il <br /> OWNER'S FINAL SUBMMIISSION <br /> OWNER FOR <br /> SHEET N0. DESCRIPTION REVIEW REVIEWOWN R PE ISS REVISION,!1S REVISION 0 REVISION a REVISION,&REVISION©REVISION�REVISION i <br /> r <br /> CML <br /> r <br /> C-000 COVER SHEET 07-24-15 09-18-15 01-05-16 <br /> C-200 EXISTING CONDITIONS PLAN 07-24-15 D9-18-15 01-05-16 <br /> C-201 I GEOTHECHNICAL REPORT AND SOIL SURVEY 07-24-15 09-18-15 r <br /> C-300 SfORMWATFR POLLUTION PREVENTION PLAN 07-24-15 09-18-15 � <br /> C-301 SfORMWATER POLLUTION PREVENTION DETAILS 07-24-15 09-18-15 <br /> i <br /> C-400 SITE PUN 07-24-15 09-18-15 01-05-16 <br /> C-401 SITE DETAILS 07-24-15 09-18-15 01-05-16 <br /> C-402 SITE DETAILS 07-24-15 09-18-15 <br /> C-403 DIMENSION CONTROL PLAN 07-24-15 09-18-15 01-05-16 j <br /> C-500 PAVING GRADING DRAINAGE AND UTILITY PLAN 07-24-15 09-18-15 01-05-16 <br /> C-501 SECTIONS 07-24-15 09-18-15 01-05-18 <br /> C-502 ROOF DRAINAGE PIAN 07-24-15 09-18-15 01-05-16 <br /> C-503 PAVING GRADING AND DRAINAGE DETAILS 07-24-15 09-18-15 <br /> I <br /> C-504 GRADING AND DRAINAGE DETAILS 07-24-15 D9-18-15 i <br /> C-505 COVE STANDARD UTILITY DETAILS- WATER 07-24-15 09-18-15 01-05-16 I <br /> C-506 COVB STANDARD UTILITY DETAILS- SEWER 07-24-15 09-18-15 <br /> C-507 UFT STATION DETAILS - PRIVATE 07-24-15 09-18-15 <br /> t <br /> C-508 UFT STATION DETAILS - PRIVATE 07-24-15 09-18-15 01-05-16 L <br /> i <br /> C-600 LANDSCAPE PLAN 07-24-15 D9-18-15 01-05-16 <br /> C-601 LANDSCAPE DETAILS 07-24-15 09-18-15 { <br /> C-602 LANDSCAPE SPECIFICATIONS 07-24-15 09-18-15 01-05-16 <br /> C-700 IRRIGATION PUN 07-24-15 09-18-15 01-05-16 <br /> C-701 IRRIGATION SPECIFICATIONS 07-24-15 09-18-15 01-05-16 <br /> ARCHITECTURAL <br /> A-001 COVER SHEET 08-21-15 09-16-15 10-08-15 01-05-16 <br /> A-101 ARCHITECTURAL FLOOR PUN k SCHEDULES 08-21-15 09-16-15 10-06-15 01-05-16 <br /> A-103 ARCH. ROOF PUN AND DETAILS 08-21-15 09-16-15 10-06-15 01-05-16 <br /> A-200 BUILDING ELEVATIONS 08-21-15 09-16-15 10-06-15 01-05-16 r <br /> A-201 WALKWAY CANOPY PUN 1G-06-15 01-05-16 <br /> A-300 WALL SECTIONS 08-21-15 09-16-15 10-06-15 01-05-16 <br /> A-301 WALL SECTIONS 08-21-15 09-16-15 10-06-15 01-05-16 <br /> A-302 WALL SECTIONS 08-21-15 09-16-15 10-06-15 01-05-16 <br /> A-303 WALL SECTIONS 08-21-15 09-16-15 10-06-15 01-05-16 <br /> A-400 ENLARGED TOILET ROOMS AND DETAILS 08-21-15 09-16-15 1G-06-15 01-05-16 ' <br /> i <br /> A-500 MISCELLANEOUS DETAILS 08-21-15 09-16-15 10-06-15 01-05-16 <br /> A-600 DOOR,WINDOW,AND FINISH SCHED.AND DETAILS 08-21-15 09-16-15 1G-06-15 01-05-16 <br /> STRUCTURAL <br /> S-1.0 STRUCTURAL SPECIFICATIONS 08-21-15 10-07-15 <br /> I <br /> S-1.1 COMPONENT AND CLADDING DESIGN WIND PRESSURES 08-21-15 10-07-15 01-05-16 I <br /> S-1.2 SCHEDULES 08-21-15 10-07-15 <br /> S-2.1 FOUNDATION PUN GB-21-15 10-07-15 01-05-16 <br /> S-2.2 FIRST FLOOR PLAN 08-21-15 10-07-15 01-05-16 <br /> S-2.3 LOWER ROOF FRAMING PLAN 08-21-15 10-07-15 01-05-16 <br /> S-2.4 UPPER ROOF FRAMING PLAN 08-21-15 10-07-15 01-05-18 r <br /> S-3.1 CROSS SECTIONS 08-21-15 1G-07-15 01-05-16 <br /> S-3.2 TYPICAL DETAILS 08-21-15 10-07-15 <br /> MECHANICAL <br /> M-100 MECH. PLAN SPECIFICATIONS,SCHEDULES AND DETAILS 08-21-15 09-16-15 10-06-15 01-05-16 <br /> F <br /> PLUMBING <br /> P-100 PLUMBING NOTES,SCHEDULES AND DETAILS 08-21-15 09-16-15 10-06-15 01-05-16 I <br /> P-200 PLUMBING PUN 08-21-15 09-16-15 1D-06-15 01-05-16 <br /> ELECTRICAL <br /> E-100 SPECIFICATIONS AND SYMBOLS 08-21-15 09-16-15 10-06-15 01-05-16 I <br /> E-101 SCHEDULES AND DEVILS 08-21-15 09-16-15 10-06-15 01-05-16 <br /> E-102 SITE ELECTRICAL PLAN 08-21-15 09-16-15 1D-06-15 ' <br /> E-103 SITE PHOTOMETRIC PIAN 08-21-15 09-16-15 10-06-15 <br /> E-200 POWER AND SYSTEMS PLAN 08-21-15 09-16-15 10-06-15 <br /> E-201 LIGHTING PLAN 08-21-15 09-16-15 10-06-15 01-05-16 <br /> E-202 CCTV PLAN 08-21-15 09-16-15 10-06-15 <br /> E-400 SINGLE-UNE DIAGRAMS AND SCHEDULES 08-21-15 09-16-15 10-06-15 <br /> E-401 SYSTEMS RISER DIAGRAMS 08-21-15 09-16-15 10-06-15 <br /> 00520-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.