Laserfiche WebLink
SECTION 00520 -Agreement (Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and <br /> -------------- -- ---------------------------------------------- <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows. <br /> ARTICLE 1 -WORK <br /> 1 01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows- <br /> The project includes enclosed and open air building to provide shelter, bathrooms, and <br /> storage. Bus / transit vehicle pick up / parking spaces, paved and secured parking for <br /> clients and operators Also constructed will be a covered shelter for walkway 1 pickup <br /> area. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows- <br /> Project Name: I.R.C. Go Line Transfer Hub <br /> County Project Number: 1330 <br /> Bid Number: 2016019 <br /> Project Address 16th Street East of Old Dixie,Vero Beach, FL 32960 <br /> ARTICLE 3 —ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative, assume all duties and responsibilities, and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 -CONTRACT TIMES <br /> 401 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 180th calendar day after the date <br /> when the Contract Times commence to run as provided in paragraph 2.03 of the General <br /> Conditions, and completed and ready for final payment in accordance with paragraph <br /> 2 <br />