My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Itemized Bid Schedule <br /> Project Name:Indian River County Go-Line Transfer Hub <br /> Project Number/Bid Number:1330/2016019 <br /> Contractor's Name: Date: <br /> Bid Summary <br /> Bid Item# Description Unit lQuantity JUnit Price JTotal <br /> A Force Account(Division 0-1) <br /> 00000-00001-1 1 Contingency LS 1 $50,000 <br /> B Building Construction(Division 1-16) 4 <br /> 01000-16000-1 Primary Building Structure and Including General Conditions LS 1 �-1 Z (793 Z (0 l 3 <br /> 01000-16000-2 Exterior Shelter Structures LS 1 z��� j 3 z 13c) <br /> C Site Work(Division 2) / / /- <br /> 02000-1 On Site-Site Work(total from p 00310-8) NA 1 NA 6 qS <br /> 02000-2 16th Street-Site Work (total from p 00310-9) NA 1 NA 221 <br /> Grand Total-Contractor's Bid —T, <br /> 3 C7 cci <br /> TOTAL BID AMOUNT(IN WORDS) (1 0� f 1 <br /> O YYl:lNPJP LA hUV)Jdtd 4:r -d 6us�r� '5&YA y a," '�D11� X1..0 Ac • � <br /> AS=Assembly LS=Lump Sum LF=Linear Foot EA=Each ED=Each Day SY=Square Yard SF= Square Foot <br /> This page of the Itemized Bid Schedule includes a summary of all costs the contractor has bid to complete the work,and the total amount of the contractor's bid <br /> The bid items for the"Primary Building Structure"and the"Exterior Shelter Structure(s)"included on this page of the Itemized Bid schedule are to be bid as lump sum items, <br /> and should include all remaining project costs that are not attributed to and not included on the portion of the Itemized Bid Schedule for Site-Work. After receipt and openin <br /> of the bids,and within 5 days of owners request,and prior to Notice to Proceed,the contractor shall submit a"Schedule of Values"which includes each item of work listed o <br /> the Itemized Bid Schedule,but also further itemizes the work by allocating portions of the lump sum bid items for the"Primary Building Structure"and the"Exterior Shelter <br /> Structure(s)"to various portions of the work.The itemization should generally follow the 16 Division Specification Format and the Contract Documents Table of Contents. <br /> Cost for Compliance with Division 0 and 1 requirements,including the cost of FGBC compliance,and federal contract compliance and administration for all aspects of the <br /> project including DBE and EEO compliance as well as compliant project bulletin board,shall be included wihtin the lump sum bid for"Primary Building Structure"and when <br /> further itemized in the required schedule of values,shall be included within a schedule of value item"General Conditions." <br /> The site work has been itemized and listed in the Bid Form,on pp.00310-5 to 00310-9.The total amount bid for the site work is apportioned under two headings. "On Site- <br /> Site Work"and"16th Street—Site Work" These amounts shall be provided in the summary above. <br /> Pay Item and"Measurement and Payment"descriptions for site work are provided in Division 2 of the Contract Documents. <br /> 00310-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.