Laserfiche WebLink
Itemized Bid Schedule <br /> Project Name:Indian River County Go-Line Transfer Hub <br /> Project Number/Bid Number:1330/2016019 <br /> Contractor's Name: Date: <br /> Bid Summary <br /> Bid Item# Description Unit lQuantity JUnit Price JTotal <br /> A Force Account(Division 0-1) <br /> 00000-00001-1 1 Contingency LS 1 $50,000 <br /> B Building Construction(Division 1-16) 4 <br /> 01000-16000-1 Primary Building Structure and Including General Conditions LS 1 �-1 Z (793 Z (0 l 3 <br /> 01000-16000-2 Exterior Shelter Structures LS 1 z��� j 3 z 13c) <br /> C Site Work(Division 2) / / /- <br /> 02000-1 On Site-Site Work(total from p 00310-8) NA 1 NA 6 qS <br /> 02000-2 16th Street-Site Work (total from p 00310-9) NA 1 NA 221 <br /> Grand Total-Contractor's Bid —T, <br /> 3 C7 cci <br /> TOTAL BID AMOUNT(IN WORDS) (1 0� f 1 <br /> O YYl:lNPJP LA hUV)Jdtd 4:r -d 6us�r� '5&YA y a," '�D11� X1..0 Ac • � <br /> AS=Assembly LS=Lump Sum LF=Linear Foot EA=Each ED=Each Day SY=Square Yard SF= Square Foot <br /> This page of the Itemized Bid Schedule includes a summary of all costs the contractor has bid to complete the work,and the total amount of the contractor's bid <br /> The bid items for the"Primary Building Structure"and the"Exterior Shelter Structure(s)"included on this page of the Itemized Bid schedule are to be bid as lump sum items, <br /> and should include all remaining project costs that are not attributed to and not included on the portion of the Itemized Bid Schedule for Site-Work. After receipt and openin <br /> of the bids,and within 5 days of owners request,and prior to Notice to Proceed,the contractor shall submit a"Schedule of Values"which includes each item of work listed o <br /> the Itemized Bid Schedule,but also further itemizes the work by allocating portions of the lump sum bid items for the"Primary Building Structure"and the"Exterior Shelter <br /> Structure(s)"to various portions of the work.The itemization should generally follow the 16 Division Specification Format and the Contract Documents Table of Contents. <br /> Cost for Compliance with Division 0 and 1 requirements,including the cost of FGBC compliance,and federal contract compliance and administration for all aspects of the <br /> project including DBE and EEO compliance as well as compliant project bulletin board,shall be included wihtin the lump sum bid for"Primary Building Structure"and when <br /> further itemized in the required schedule of values,shall be included within a schedule of value item"General Conditions." <br /> The site work has been itemized and listed in the Bid Form,on pp.00310-5 to 00310-9.The total amount bid for the site work is apportioned under two headings. "On Site- <br /> Site Work"and"16th Street—Site Work" These amounts shall be provided in the summary above. <br /> Pay Item and"Measurement and Payment"descriptions for site work are provided in Division 2 of the Contract Documents. <br /> 00310-4 <br />