My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-110
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2019 1:36:23 PM
Creation date
8/8/2016 10:53:34 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
07/12/2016
Control Number
2016-110
Agenda Item Number
12.F.1.
Entity Name
Barth Construction
GoLine
Subject
GoLine Bus Transfer Hub
Contract and Specifications
Area
1235 16th St.
Project Number
1330
Bid Number
2016019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Go-Line Transfer Hub <br /> 13. BONDING REQUIREMENTS <br /> Bid Bond Requirements (Construction) <br /> (a) Bid Security <br /> A Bid Bond must be issued by a fully qualified surety company acceptable to Owner and <br /> listed as a company currently authorized under 31 CFR, Part 223 as possessing a <br /> Certificate of Authority as described thereunder. <br /> (b) Rights Reserved <br /> In submitting this Bid, it is understood and agreed by bidder that the right is reserved by <br /> Owner to reject any and all bids, or part of any bid, and it is agreed that the Bid may not <br /> be withdrawn for a period of ninety (90) days subsequent to the opening of bids, without <br /> the written consent of Owner. <br /> It is also understood and agreed that if the undersigned bidder should withdraw any part <br /> or all of his bid within ninety (90) days after the bid opening without the written consent <br /> of Owner, shall refuse or be unable to enter into this Contract, as provided above, or <br /> refuse or be unable to furnish adequate and acceptable Public Construction Bonds, as <br /> provided above, or refuse or be unable to furnish adequate and acceptable insurance, as <br /> provided above, he shall forfeit his bid security to the extent of Owner's damages <br /> occasioned by such withdrawal, or refusal, or inability to enter into an agreement, or <br /> provide adequate security therefore. <br /> It is further understood and agreed that to the extent the defaulting bidder's Bid Bond, <br /> Certified Check, Cashier's Check, Treasurer's Check, and/or Official Bank Check <br /> (excluding any income generated thereby which has been retained by Owner as provided <br /> in section 00400 (Bid Bond) in Division 0 of the Contract Documents and <br /> Specifications shall prove inadequate to fully recompense Owner for the damages <br /> occasioned by default, then the undersigned bidder agrees to indemnify Owner and pay <br /> over to Owner the difference between the bid security and Owner's total damages, so as <br /> to make Owner whole. <br /> The undersigned understands that any material alteration of any of the above or any of <br /> the material contained on this form, other than that requested, will render the bid <br /> unresponsive. <br /> Public Construction Bond Requirements (Adopted for IRC Go-Line Transfer Hub) <br /> The Contractor shall be required to obtain a Public Construction Bond pursuant to <br /> Chapter 255.05 Florida Statutes. <br /> (a) Public Construction Bonds <br /> 00421-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.