My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/03/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/03/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:20:24 PM
Creation date
8/10/2016 12:01:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/03/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Board of County Commissioners <br />1801 27th Street <br />Vero Beach, Florida 32960 <br />Telephone: (772) 567-8000 FAX: 772-778-9391 <br />AMENDMENT NO. 2 <br />TO <br />WORK ORDER NO. 1 (ENGINEERING) <br />FOR <br />PROFESSIONAL CIVIL ENGINEERING SERVICES AGREEMENT <br />WITH <br />CARTER ASSOCIATES, INC. <br />PROJECT: <br />41st Street and U.S. Highway No. 1- Intersection Improvements <br />Indian River County Project No. 1359 <br />This Amendment No. 2 to Work Order No. 1 is in accordance with the existing AGREEMENT <br />dated November 15, 2011 as amended November 4, 2014 between Carter Associates, Inc. <br />(ENGINEER) and Indian River County (COUNTY). This Amendment No. 2 to Work Order No. 1 <br />amends the Agreement as follows: <br />SECTION I - SCOPE OF SERVICES <br />This Amendment No. 2 provides additional professional engineering services relative to the <br />redesign of the 41st Street / US 1 intersection along with the addition of two more new mast <br />arms at the intersection and structural analysis for the addition of back plates to all existing <br />signal heads. <br />As agreed upon between ENGINEER and COUNTY, the ENGINEER shall provide professional <br />services to complete all tasks as outlined in this Amendment No. 2 to Work Order No. 1; <br />specifically detailed in the attached proposal dated April 5, 2016, Exhibit B. <br />SECTION II — TIME FOR COMPLETION & DELIVERABLESNVORK PRODUCT <br />1. Project shall be completed as follows: <br />a. Within 60 calendar days of Notice to Proceed. <br />b. Time of FINAL project completion shall be within 30 calendar days of receipt of the <br />County's review comments from the 100% "Paper Submittal". <br />2. Deliverables -The ENGINEER shall provide the COUNTY: <br />a. As defined in the attached proposal and scope of services (Exhibit B) and related <br />digital Auto CAD and PDF files. <br />b. 60%. 90% and 100% submittals shall include 3 sets of plans, 1 original Cost <br />Estimate. <br />c. FINAL Deliverables, five (5) paper"hardcopy" signed and sealed sets of plans (I.E. <br />Borders). Sheeted and model space (as applicable) AutoCad drawing file in release <br />2013, PDF formats, reports, and other pertinent documents in adequate recording <br />fashion. All electronic files to be on CD. <br />F.\Pub6c Works\ENGINEW NG DMSION PROJECTS"94 W St U51 Left Tum larc\Admtn\Agree mems\Carter EnyVRC CARTER ENG AMENDMENT 2. WO Nm 1, S-32016doc 77 <br />
The URL can be used to link to this page
Your browser does not support the video tag.